IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,253

matching recommendations
Reset
NAICS 2213 Water, Sewage and Other Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0156 # 10 Y:2020 10 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $542 $1,785 Not Implemented
MA0817 # 01 Y:2020 01 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $2,919 $5,650 Implemented
MA0817 # 02 Y:2020 02 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,876 $50 Implemented
MA0817 # 03 Y:2020 03 2020 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,042 $100 Not Implemented
MA0817 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $387 $1,503 Implemented
UU0164 # 01 Y:2020 01 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,252 $2,000 Not Implemented
UU0164 # 02 Y:2020 02 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $1,660 $500 Not Implemented
UU0164 # 03 Y:2020 03 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $865 $2,038 Not Implemented
UU0164 # 04 Y:2020 04 2020 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $750 $750 Not Implemented
UU0164 # 05 Y:2020 05 2020 USE RADIANT HEATER FOR SPOT HEATING $245 $540 Not Implemented
MA0816 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $66,795 $292,241 Not Implemented
MA0816 # 02 Y:2020 02 2020 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $3,363 $3,000 Not Implemented
MA0816 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $917 $4,629 Implemented
MA0816 # 04 Y:2020 04 2020 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $493 $100 Not Implemented
TR0024 # 01 Y:2020 01 2020 MAINTAIN MACHINES TO REDUCE LEAKS $402 $576 Not Implemented
TR0024 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $889 $1,131 Not Implemented
TR0024 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $400 $767 Not Implemented
TR0024 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $154 $100 Not Implemented
TR0024 # 05 Y:2020 05 2020 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $4,527 $10,313 Not Implemented
MA0815 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $90,005 $373,605 Not Implemented
MA0815 # 02 Y:2020 02 2020 USE EXISTING DAM TO GENERATE ELECTRICITY $33,419 $150,000 Not Implemented
MA0815 # 03 Y:2020 03 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,675 $375 Implemented
MA0815 # 04 Y:2020 04 2020 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $8,358 $250 Not Implemented
MA0815 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,596 $24,389 Implemented
MA0815 # 06 Y:2020 06 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,915 $250 Not Implemented