IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,253

matching recommendations
Reset
NAICS 2213 Water, Sewage and Other Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0764 # 01 Y:2016 01 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $45,693 $125,000 Not Implemented
MA0764 # 02 Y:2016 02 2016 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,889 $5,000 Not Implemented
MA0764 # 03 Y:2016 03 2016 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,264 $500 Not Implemented
UK1607 # 01 Y:2016 01 2016 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $53,387 $292,000 Not Implemented
UK1607 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,600 $41,160 Implemented
UK1607 # 03 Y:2016 03 2016 UPGRADE OBSOLETE EQUIPMENT $19,747 $4,240 Implemented
UK1607 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $469 $1,775 Implemented
UK1606 # 01 Y:2016 01 2016 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $19,749 $90,000 Not Implemented
UK1606 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,258 $7,310 Not Implemented
UK1606 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,300 $8,440 Not Implemented
UK1606 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $316 $0 Not Implemented
UK1606 # 05 Y:2016 05 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,013 $0 Not Implemented
UK1606 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,016 $2,500 Not Implemented
SU0419 # 01 Y:2016 01 2016 INSTALL TIMERS AND/OR THERMOSTATS $506 $412 Not Implemented
SU0419 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $246 $190 Not Implemented
SU0419 # 03 Y:2016 03 2016 USE PHOTOCELL CONTROLS $477 $451 Not Implemented
SU0419 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,749 $7,697 Not Implemented
SU0419 # 05 Y:2016 05 2016 REDUCE VENTILATION AIR $491 $899 Not Implemented
IA0561 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,131 $19,250 Implemented
IA0561 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $1,633 $944 Implemented
IA0561 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,312 $560 Implemented
IA0561 # 04 Y:2016 04 2016 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $533 $195 Implemented
IA0561 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $504 $70 Not Implemented
IA0561 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,225 $5,350 Implemented
MA0758 # 01 Y:2016 01 2016 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,549 $2,836 Implemented