IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
NAICS 2213 Water, Sewage and Other Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0797 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $43,815 $607,740 n/a
OR0797 # 05 Y:2024 05 2024 INSTALL WIND POWERED ELECTRIC GENERATOR $5,114 $43,821 n/a
OR0797 # 03 Y:2024 03 2024 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $7,711 $22,822 n/a
OR0797 # 04 Y:2024 04 2024 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,405 $16,073 n/a
OR0797 # 02 Y:2024 02 2024 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,639 $227 n/a
OR0797 # 01 Y:2024 01 2024 USE EXISTING DAM TO GENERATE ELECTRICITY $4,211 $17,825 n/a
OR0784 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $4,041 $12,113 Implemented
OR0784 # 01 Y:2023 01 2023 USE OTHER WASTE CONCENTRATION METHODS $61,484 $125,000 Not Implemented
OR0784 # 02 Y:2023 02 2023 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $343,134 $700,000 Not Implemented
OR0783 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $3,100 $12,972 Not Implemented
OR0783 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $668 $2,977 Not Implemented
OR0783 # 01 Y:2023 01 2023 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $42,275 $536,339 Not Implemented
OR0760 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,420 $4,344 Implemented
OR0760 # 03 Y:2023 03 2023 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $112,516 $735,625 Implemented
OR0760 # 01 Y:2023 01 2023 ELIMINATE/REDUCE AN OPERATION $3,852 $0 Implemented
OR0758 # 03 Y:2022 03 2022 USE AUTOMATIC FLOW CONTROL $39,055 $90,000 Not Implemented
OR0758 # 02 Y:2022 02 2022 PAY UTILITY BILLS ON TIME $1,874 $0 Not Implemented
OR0758 # 01 Y:2022 01 2022 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $217,268 $1,015,000 Not Implemented
OR0752 # 03 Y:2022 03 2022 SELL COMBUSTIBLE WASTE $482,170 $1,896,000 Not Implemented
OR0752 # 01 Y:2022 01 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,404 $321 Not Implemented
OR0752 # 02 Y:2022 02 2022 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $6,067 $14,203 Not Implemented
OR0747 # 02 Y:2022 02 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,708 $7,587 Not Implemented
OR0747 # 03 Y:2022 03 2022 UPGRADE OBSOLETE EQUIPMENT $57,063 $757,015 Not Implemented
OR0747 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $487 $1,546 Not Implemented
OR0740 # 06 Y:2021 06 2021 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $14,480 $12,929 Implemented