IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

617

matching recommendations
Reset
NAICS 22131 Water Supply and Irrigation Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0024 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $154 $100 Not Implemented
TR0024 # 05 Y:2020 05 2020 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $4,527 $10,313 Not Implemented
MA0815 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $90,005 $373,605 Not Implemented
MA0815 # 02 Y:2020 02 2020 USE EXISTING DAM TO GENERATE ELECTRICITY $33,419 $150,000 Not Implemented
MA0815 # 03 Y:2020 03 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,675 $375 Implemented
MA0815 # 04 Y:2020 04 2020 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $8,358 $250 Not Implemented
MA0815 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,596 $24,389 Implemented
MA0815 # 06 Y:2020 06 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,915 $250 Not Implemented
AS0481 # 01 Y:2020 01 2020 USE POWER DURING OFF-PEAK PERIODS $7,396 $298 Implemented
AS0481 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,249 $1,100 Not Implemented
AS0481 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,880 $2,996 Not Implemented
AS0481 # 04 Y:2020 04 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $3,159 $9,000 Not Implemented
AS0481 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $1,068 $540 Not Implemented
AS0481 # 06 Y:2020 06 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $706 $912 Implemented
AS0481 # 07 Y:2020 07 2020 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $59 $113 Not Implemented
UU0163 # 01 Y:2020 01 2020 USE EXISTING DAM TO GENERATE ELECTRICITY $38,699 $100,000 Not Implemented
UU0163 # 02 Y:2020 02 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $29,850 $1,200 Not Implemented
UU0163 # 03 Y:2020 03 2020 ADOPT IN-HOUSE MATERIAL GENERATION $11,324 $5,000 Implemented
UU0163 # 04 Y:2020 04 2020 OPTIMIZE PLANT POWER FACTOR $4,707 $8,012 Not Implemented
UU0163 # 05 Y:2020 05 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,576 $2,000 Implemented
UU0163 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,414 $15,055 Implemented
UU0163 # 07 Y:2020 07 2020 ADOPT IN-HOUSE MATERIAL GENERATION $10,477 $5,000 Implemented
WV0588 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,179 $22,995 Implemented
WV0588 # 02 Y:2020 02 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $9,425 $9,350 Not Implemented
WV0588 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,027 $10,000 Not Implemented