IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

601

matching recommendations
Reset
NAICS 22131 Water Supply and Irrigation Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0163 # 02 Y:2020 02 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $29,850 $1,200 Not Implemented
UU0163 # 03 Y:2020 03 2020 ADOPT IN-HOUSE MATERIAL GENERATION $11,324 $5,000 Implemented
UU0163 # 04 Y:2020 04 2020 OPTIMIZE PLANT POWER FACTOR $4,707 $8,012 Not Implemented
UU0163 # 05 Y:2020 05 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,576 $2,000 Implemented
UU0163 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,414 $15,055 Implemented
UU0163 # 07 Y:2020 07 2020 ADOPT IN-HOUSE MATERIAL GENERATION $10,477 $5,000 Implemented
WV0588 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,179 $22,995 Implemented
WV0588 # 02 Y:2020 02 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $9,425 $9,350 Not Implemented
WV0588 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,027 $10,000 Not Implemented
WV0588 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,724 $0 Implemented
WV0588 # 05 Y:2020 05 2020 DEVELOP A REPAIR/REPLACE POLICY $691 $651 Implemented
UA0218 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,378 $6,360 Implemented
UA0218 # 02 Y:2019 02 2019 INSTALL OCCUPANCY SENSORS $1,874 $198 Implemented
UA0218 # 03 Y:2019 03 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $27,441 $2,000 Not Implemented
UA0218 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $7,816 $6,955 Not Implemented
NC0637 # 01 Y:2019 01 2019 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $23,778 $10,000 Not Implemented
NC0637 # 02 Y:2019 02 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,505 $30,000 Not Implemented
NC0637 # 03 Y:2019 03 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $20,241 $210,000 Not Implemented
NC0637 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $1,499 $12,000 Not Implemented
TR0019 # 01 Y:2019 01 2019 USE DEMAND CONTROLLER OR LOAD SHEDDER $41,476 $21,000 Not Implemented
TR0019 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $637 $2,470 Implemented
TR0019 # 03 Y:2019 03 2019 INSTALL WIND POWERED ELECTRIC GENERATOR $135,960 $1,346,000 Not Implemented
NC0640 # 01 Y:2019 01 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,832 $700 Not Implemented
NC0640 # 02 Y:2019 02 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $30,092 $500 Implemented
NC0640 # 03 Y:2019 03 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $19,071 $157,500 Not Implemented