IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

601

matching recommendations
Reset
NAICS 22131 Water Supply and Irrigation Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL2107 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,152 $2,480 n/a
CL2107 # 03 Y:2021 03 2021 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $950 $4,500 n/a
CL2107 # 04 Y:2021 04 2021 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $35,390 $0 n/a
UA0238 # 01 Y:2021 01 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $161,890 $279,811 Implemented
UA0238 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,488 $5,859 Implemented
UA0238 # 03 Y:2021 03 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,093 $16,210 Implemented
AS0508 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $79,572 $28,606 Not Implemented
AS0508 # 02 Y:2021 02 2021 ELIMINATE/REDUCE AN OPERATION $20,000 $200 Implemented
AS0508 # 03 Y:2021 03 2021 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,773 $1,500 Implemented
AS0508 # 04 Y:2021 04 2021 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $427 $114 Implemented
AS0508 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $389 $529 Implemented
UU0183 # 01 Y:2021 01 2021 SELL COMBUSTIBLE WASTE $149,294 $144,000 Implemented
UU0183 # 02 Y:2021 02 2021 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $118,667 $7,000 Not Implemented
UU0183 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $100,049 $157,500 Not Implemented
UU0183 # 04 Y:2021 04 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $35,893 $14,200 Not Implemented
UU0183 # 05 Y:2021 05 2021 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $19,111 $20,527 Implemented
UU0183 # 06 Y:2021 06 2021 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $15,681 $1,607 Implemented
UU0183 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,906 $22,506 Implemented
UU0183 # 08 Y:2021 08 2021 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $794 $1,175 Not Implemented
AS0504 # 01 Y:2021 01 2021 COMBINE UTILITY METERS $73,584 $1,313 Not Implemented
AS0504 # 02 Y:2021 02 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,984 $2,000 Implemented
AS0504 # 03 Y:2021 03 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,011 $18,815 Not Implemented
AS0504 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,467 $4,029 Implemented
AS0504 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $2,778 $3,974 Implemented
AS0504 # 06 Y:2021 06 2021 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $1,029 $245 Implemented