IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,603

matching recommendations
Reset
NAICS 22132 Sewage Treatment Facilities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0568 # 04 Y:2021 04 2021 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $8,146 $700 Not Implemented
UF0568 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $3,117 $9,240 Implemented
UF0568 # 06 Y:2021 06 2021 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $1,828 $0 Not Implemented
UF0568 # 07 Y:2021 07 2021 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,670,260 $53,000 Not Implemented
UF0568 # 08 Y:2021 08 2021 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $8,760 $8,000 Not Implemented
UF0568 # 09 Y:2021 09 2021 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $3,655 $0 Implemented
UF0567 # 01 Y:2021 01 2021 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $123,727 $246,613 Implemented
UF0567 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $95,985 $228,343 Implemented
UF0567 # 03 Y:2021 03 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $42,803 $42,764 Implemented
UF0567 # 04 Y:2021 04 2021 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $9,372 $14,250 Implemented
UF0567 # 05 Y:2021 05 2021 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $1,402 $0 Not Implemented
UF0567 # 06 Y:2021 06 2021 REUSE / RECYCLE/ SELL PAPER PRODUCTS $2,719,160 $106,000 Not Implemented
UF0567 # 07 Y:2021 07 2021 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $8,760 $8,000 Not Implemented
UF0567 # 08 Y:2021 08 2021 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $5,867 $0 Implemented
AM0828 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $26,110 $1,050 Implemented
AM0828 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,720 $4,470 Implemented
AM0828 # 03 Y:2021 03 2021 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $4,000 $4,250 Not Implemented
AM0828 # 04 Y:2021 04 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,950 $8,890 Implemented
AM0828 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $1,530 $1,360 Implemented
AM0828 # 06 Y:2021 06 2021 USE SYNTHETIC LUBRICANT $1,400 $660 Implemented
NL0060 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,780 $6,000 Implemented
NL0060 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,978 $8,057 Implemented
NL0060 # 03 Y:2021 03 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $908 $1,790 Implemented
AM0826 # 01 Y:2021 01 2021 MINIMIZE WATER USAGE $31,800 $136,000 Implemented
AM0826 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,325 $5,710 Implemented