IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,603

matching recommendations
Reset
NAICS 22132 Sewage Treatment Facilities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0564 # 11 Y:2021 11 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,256 $50,039 Implemented
SF0564 # 12 Y:2021 12 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,006 $31,025 Not Implemented
SF0564 # 13 Y:2021 13 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,053 $65,832 Implemented
IP0143 # 01 Y:2020 01 2020 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $233 $0 Implemented
IP0143 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,901 $48 Implemented
IP0143 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $4,444 $143 Not Implemented
IP0143 # 04 Y:2020 04 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,298 $420 Implemented
IP0143 # 05 Y:2020 05 2020 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $474 $461 Not Implemented
IP0143 # 06 Y:2020 06 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $50,956 $54,000 Not Implemented
IP0143 # 07 Y:2020 07 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,059 $1,227 Implemented
IP0143 # 08 Y:2020 08 2020 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $118,506 $210,000 Not Implemented
IP0143 # 09 Y:2020 09 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,338 $16,716 Implemented
IP0143 # 10 Y:2020 10 2020 INSULATE BARE EQUIPMENT $27,535 $79,808 Not Implemented
AS0501 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,454 $940 Not Implemented
AS0501 # 02 Y:2021 02 2021 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $36,391 $37,849 Not Implemented
AS0501 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,005 $7,546 Implemented
AS0501 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,172 $7,423 Not Implemented
AS0501 # 05 Y:2021 05 2021 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $1,787 $103 Not Implemented
AS0501 # 06 Y:2021 06 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,736 $1,408 Not Implemented
AS0501 # 07 Y:2021 07 2021 INSTALL OCCUPANCY SENSORS $1,080 $2,877 Implemented
AS0500 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $231,021 $2,706 Not Implemented
AS0500 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,048 $811 Implemented
AS0500 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,453 $8,113 Implemented
AS0500 # 04 Y:2021 04 2021 INSTALL OCCUPANCY SENSORS $1,279 $1,850 Implemented
AS0500 # 05 Y:2021 05 2021 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $718 $38 Implemented