IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,515

matching recommendations
Reset
NAICS 22132 Sewage Treatment Facilities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0083 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,182 $4,945 n/a
NL0083 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $854 $470 n/a
NL0083 # 06 Y:2023 06 2023 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $800 $1,548 n/a
NL0083 # 07 Y:2023 07 2023 IMPLEMENT A MAINTENANCE PROGRAM TO KEEP RACKS AND TANKS FREE OF RUST, CRACKS, OR CORROSION $200 $40 n/a
MA0862 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,114 $20,600 n/a
MA0862 # 07 Y:2023 07 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,570 $2,160 n/a
MA0862 # 06 Y:2023 06 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,059 $800 n/a
MA0862 # 05 Y:2023 05 2023 USE HEAT PUMP FOR SPACE CONDITIONING $4,461 $14,400 n/a
MA0862 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $11,416 $78,169 n/a
MA0862 # 03 Y:2023 03 2023 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $24,241 $55,000 n/a
MA0862 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,262 $30,900 n/a
MA0861 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,245 $1,250 n/a
MA0861 # 04 Y:2023 04 2023 USE HEAT PUMP FOR SPACE CONDITIONING $7,254 $18,500 n/a
MA0861 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,273 $19,000 n/a
MA0861 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $98,833 $861,320 n/a
MA0861 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,846 $17,375 n/a
MA0860 # 01 Y:2023 01 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $6,991 $1,650 n/a
MA0860 # 02 Y:2023 02 2023 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,955 $500 n/a
MA0860 # 03 Y:2023 03 2023 USE HEAT PUMP FOR SPACE CONDITIONING $1,588 $5,500 n/a
MUWT02 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $98 $20 Not Implemented
MUWT02 # 02 Y:2023 02 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $294 $0 Not Implemented
MUWT02 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,011 $15,399 Not Implemented
IP0175 # 01 Y:2023 01 2023 USE OPTIMUM TEMPERATURE $452 $0 Not Implemented
IP0175 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $30,222 $6,500 Not Implemented
IP0175 # 03 Y:2023 03 2023 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $22,456 $24,300 Not Implemented