IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
NAICS 22132 Sewage Treatment Facilities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2206 # 07 Y:2022 07 2022 USE BATTERY STORAGE FOR DEMAND CONTROL $27,967 $231,837 Not Implemented
UC2206 # 06 Y:2022 06 2022 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $1,713 $3,300 Not Implemented
UC2206 # 05 Y:2022 05 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,660 $16,842 Not Implemented
UC2206 # 04 Y:2022 04 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,119 $33,560 Not Implemented
UC2206 # 03 Y:2022 03 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $57,154 $500 Not Implemented
UC2206 # 02 Y:2022 02 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,557 $1,500 Not Implemented
UC2206 # 01 Y:2022 01 2022 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $31,115 $0 Not Implemented
UC2205 # 03 Y:2022 03 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,990 $500 Not Implemented
UC2205 # 06 Y:2022 06 2022 USE BATTERY STORAGE FOR DEMAND CONTROL $65,817 $383,577 Not Implemented
UC2205 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $279,536 $1,875,313 Not Implemented
UC2205 # 04 Y:2022 04 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,840 $500 Not Implemented
UC2205 # 02 Y:2022 02 2022 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $19,018 $0 Not Implemented
UC2205 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,071 $2,641 Not Implemented
MA0790 # 01 Y:2018 01 2018 USE DEMAND CONTROLLER OR LOAD SHEDDER $207,219 $1,000,000 Not Implemented
MA0790 # 09 Y:2018 09 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,816 $4,785 Not Implemented
MA0790 # 08 Y:2018 08 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,934 $6,774 Implemented
MA0790 # 07 Y:2018 07 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $4,286 $100 Not Implemented
MA0790 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,658 $25,350 Implemented
MA0790 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,372 $5,831 Implemented
MA0790 # 04 Y:2018 04 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $19,380 $500 Implemented
MA0790 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,345 $33,774 Implemented
MA0790 # 02 Y:2018 02 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $48,698 $124,000 Implemented