IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
NAICS 22132 Sewage Treatment Facilities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0784 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $4,041 $12,113 n/a
OR0784 # 01 Y:2023 01 2023 USE OTHER WASTE CONCENTRATION METHODS $61,484 $125,000 n/a
OR0784 # 02 Y:2023 02 2023 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $343,134 $700,000 n/a
OR0783 # 01 Y:2023 01 2023 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $42,275 $536,339 n/a
OR0783 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $668 $2,977 n/a
OR0783 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $3,100 $12,972 n/a
OR0758 # 02 Y:2022 02 2022 PAY UTILITY BILLS ON TIME $1,874 $0 Not Implemented
OR0758 # 01 Y:2022 01 2022 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $217,268 $1,015,000 Not Implemented
OR0758 # 03 Y:2022 03 2022 USE AUTOMATIC FLOW CONTROL $39,055 $90,000 Not Implemented
OR0752 # 01 Y:2022 01 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,404 $321 Not Implemented
OR0752 # 02 Y:2022 02 2022 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $6,067 $14,203 Not Implemented
OR0752 # 03 Y:2022 03 2022 SELL COMBUSTIBLE WASTE $482,170 $1,896,000 Not Implemented
OR0747 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $487 $1,546 Not Implemented
OR0747 # 02 Y:2022 02 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,708 $7,587 Not Implemented
OR0747 # 03 Y:2022 03 2022 UPGRADE OBSOLETE EQUIPMENT $57,063 $757,015 Not Implemented
OR0740 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $69,219 $8,189 Implemented
OR0740 # 02 Y:2021 02 2021 UPGRADE OBSOLETE EQUIPMENT $68,316 $149,022 Not Implemented
OR0740 # 03 Y:2021 03 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $54,988 $79,709 Implemented
OR0740 # 04 Y:2021 04 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $39,964 $60,439 Implemented
OR0740 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,831 $84,560 Implemented
OR0740 # 06 Y:2021 06 2021 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $14,480 $12,929 Implemented
OR0740 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,547 $3,289 Implemented
OR0705 # 01 Y:2018 01 2018 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $1,817,773 $8,000,000 Implemented
OR0705 # 02 Y:2018 02 2018 IMPROVE COMBUSTION CONTROL CAPABILITY $6,117 $13,300 Not Implemented
OR0705 # 03 Y:2018 03 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,640 $5,820 Not Implemented