Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,603
matching recommendationsNAICS | 221320 | Sewage Treatment Facilities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0174 # 06 Y:2022 | 06 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,216 | $0 | Implemented |
WM0174 # 07 Y:2022 | 07 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $821 | $735 | Not Implemented |
WM0174 # 08 Y:2022 | 08 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $716 | $850 | Implemented |
WM0174 # 09 Y:2022 | 09 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $123 | $0 | Not Implemented |
OR0747 # 01 Y:2022 | 01 | 2022 | OPTIMIZE PLANT POWER FACTOR | $487 | $1,546 | Not Implemented |
OR0747 # 02 Y:2022 | 02 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,708 | $7,587 | Not Implemented |
OR0747 # 03 Y:2022 | 03 | 2022 | UPGRADE OBSOLETE EQUIPMENT | $57,063 | $757,015 | Not Implemented |
UF0573 # 01 Y:2022 | 01 | 2022 | USE EXISTING DAM TO GENERATE ELECTRICITY | $223,605 | $552,197 | Implemented |
UF0573 # 02 Y:2022 | 02 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $50,619 | $45,817 | Implemented |
UF0573 # 03 Y:2022 | 03 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $35,580 | $50,843 | Implemented |
UF0573 # 04 Y:2022 | 04 | 2022 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $324,658 | $1,232,000 | Implemented |
UF0573 # 05 Y:2022 | 05 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $35,912 | $10,000 | Implemented |
UF0573 # 06 Y:2022 | 06 | 2022 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $4,292 | $0 | Implemented |
IP0153 # 01 Y:2021 | 01 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,018 | $53 | Not Implemented |
IP0153 # 02 Y:2021 | 02 | 2021 | INSTALL OCCUPANCY SENSORS | $73 | $128 | Not Implemented |
IP0153 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,112 | $6,705 | Not Implemented |
IP0153 # 04 Y:2021 | 04 | 2021 | MAINTAIN MACHINES TO REDUCE LEAKS | $36,991 | $130,160 | Not Implemented |
UF0571 # 01 Y:2022 | 01 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $72,351 | $83,616 | Implemented |
UF0571 # 02 Y:2022 | 02 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $23,651 | $18,000 | Implemented |
UF0571 # 03 Y:2022 | 03 | 2022 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $22,414 | $51,208 | Implemented |
UF0571 # 04 Y:2022 | 04 | 2022 | INSTALL OCCUPANCY SENSORS | $4,673 | $5,569 | Implemented |
UF0571 # 05 Y:2022 | 05 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $65,277 | $10,000 | Implemented |
UF0571 # 06 Y:2022 | 06 | 2022 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $8,754 | $0 | Implemented |
UF0570 # 01 Y:2022 | 01 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $61,494 | $87,677 | Implemented |
UF0570 # 02 Y:2022 | 02 | 2022 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $15,702 | $33,667 | Implemented |