IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
NAICS 221320 Sewage Treatment Facilities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0344 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $61,110 $32,240 Implemented
MZ0344 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $1,547 $1,000 Implemented
MZ0344 # 01 Y:2023 01 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,614 $750 Implemented
MZ0344 # 05 Y:2023 05 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $15,137 $12,000 Not Implemented
MZ0344 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $59,175 $0 Implemented
MZ0325 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $56,407 $636,000 Not Implemented
MZ0325 # 01 Y:2022 01 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $113,192 $0 Implemented
MZ0325 # 04 Y:2022 04 2022 MINIMIZE WATER USAGE $50,371 $4,080 Implemented
MZ0325 # 03 Y:2022 03 2022 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $224,497 $226,000 Not Implemented
MZ0312 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $720 $1,350 Implemented
MZ0312 # 04 Y:2021 04 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,140 $480 Implemented
MZ0312 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $2,207 $8,156 Not Implemented
MZ0312 # 02 Y:2021 02 2021 USE EXISTING DAM TO GENERATE ELECTRICITY $20,946 $306,240 Not Implemented
MZ0312 # 01 Y:2021 01 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $19,186 $216,865 Not Implemented
MZ0283 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $221 $1,096 Not Implemented
MZ0283 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,743 $12,366 Not Implemented
MZ0283 # 05 Y:2019 05 2019 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $74,880 $0 Not Implemented
MZ0283 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $36 $20 Not Implemented
MZ0283 # 02 Y:2019 02 2019 ADOPT IN-HOUSE MATERIAL GENERATION $14,280 $43,150 Not Implemented
MZ0283 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,320 $320 Not Implemented
MZ0267 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $866 $0 Not Implemented
MZ0267 # 04 Y:2019 04 2019 RECOVER AND REUSE COOLING WATER $15,813 $73,900 Implemented
MZ0267 # 03 Y:2019 03 2019 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $53,575 $240,000 Implemented
MZ0267 # 02 Y:2019 02 2019 USE PHOTOCELL CONTROLS $1,079 $410 Not Implemented
MZ0267 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,711 $4,573 Implemented