IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

82

matching recommendations
Reset
NAICS 221320 Sewage Treatment Facilities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0098 # 01 Y:2016 01 2016 USE SYNTHETIC LUBRICANT $31,522 $56 Implemented
WM0098 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,985 $6,397 Implemented
WM0098 # 03 Y:2016 03 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,494 $4,661 Not Implemented
WM0098 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,481 $0 Implemented
WM0098 # 05 Y:2016 05 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,011 $1,000 Not Implemented
WM0098 # 06 Y:2016 06 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,334 $0 Not Implemented
WM0098 # 07 Y:2016 07 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,178 $0 Not Implemented
WM0098 # 08 Y:2016 08 2016 RECOVER WASTE HEAT FROM EQUIPMENT $888 $1,140 Not Implemented
BS0092 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $12,593 $2,530 Not Implemented
BS0092 # 03 Y:2016 03 2016 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,842 $464 Not Implemented
BS0092 # 04 Y:2016 04 2016 DIRECT WARMEST AIR TO COMBUSTION INTAKE $4,190 $6,640 Not Implemented
BS0092 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,692 $3,161 Not Implemented
BS0092 # 06 Y:2016 06 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,891 $3,900 Not Implemented
BS0092 # 01 Y:2016 01 2016 USE EXISTING DAM TO GENERATE ELECTRICITY $84,096 $646,400 Not Implemented
WV0536 # 02 Y:2016 02 2016 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $8,800 $31,000 Not Implemented
WV0536 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,902 $82,500 Not Implemented
WV0536 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $394 $60 Not Implemented
WV0536 # 03 Y:2016 03 2016 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,788 $1,000 Implemented
WV0536 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,983 $2,015 Implemented
WV0536 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,808 $2,250 Implemented
WV0536 # 06 Y:2016 06 2016 DEVELOP A REPAIR/REPLACE POLICY $1,406 $617 Implemented
WV0536 # 07 Y:2016 07 2016 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $735 $4,320 Implemented
UK1608 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,569 $9,415 Not Implemented
UK1608 # 02 Y:2016 02 2016 UPGRADE OBSOLETE EQUIPMENT $15,087 $75,544 Implemented
UK1608 # 01 Y:2016 01 2016 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $125,405 $660,000 Not Implemented