IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
NAICS 238120 Structural Steel and Precast Concrete Contractors
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0845 # 09 Y:2013 09 2013 OPTIMIZE PLANT POWER FACTOR $2,148 $7,526 Not Implemented
OK0845 # 08 Y:2013 08 2013 USE RADIANT HEATER FOR SPOT HEATING $20,678 $90,000 Not Implemented
OK0845 # 07 Y:2013 07 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,780 $1,378 Not Implemented
OK0845 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,354 $12,299 Implemented
OK0845 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $90 $366 Not Implemented
OK0845 # 03 Y:2013 03 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,271 $3,608 Not Implemented
OK0845 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,058 $0 Not Implemented
OK0845 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,941 $550 Implemented
OK0845 # 06 Y:2013 06 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $318 $1,584 Implemented
WV0391 # 03 Y:2009 03 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,520 $800 Implemented
WV0391 # 10 Y:2009 10 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $374 $300 Implemented
WV0391 # 04 Y:2009 04 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,238 $8,890 Not Implemented
WV0391 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,896 $8,900 Not Implemented
WV0391 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,483 $105 Implemented
WV0391 # 07 Y:2009 07 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $3,782 $8,543 Not Implemented
WV0391 # 08 Y:2009 08 2009 DEVELOP A REPAIR/REPLACE POLICY $2,651 $605 Implemented
WV0391 # 09 Y:2009 09 2009 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,609 $1,000 Implemented
WV0391 # 02 Y:2009 02 2009 USE PHOTOCELL CONTROLS $11,811 $6,850 Not Implemented
WV0391 # 01 Y:2009 01 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $27,893 $26,000 Not Implemented
NC0278 # 06 Y:2004 06 2004 USE PHOTOCELL CONTROLS $72 $130 Implemented
NC0278 # 05 Y:2004 05 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $574 $25 Implemented
NC0278 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,132 $630 Not Implemented
NC0278 # 03 Y:2004 03 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $47 $25 Implemented
NC0278 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $458 $1,750 Not Implemented
NC0278 # 01 Y:2004 01 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,343 $18,000 n/a