IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

320

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0443 # 06 Y:2011 06 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $19,349 $2,235 Implemented
MI0209 # 01 Y:2011 01 2011 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $4,297,734 $3,000,000 Implemented
MI0209 # 04 Y:2011 04 2011 REPLACE TREATED WATER WITH WELL / SURFACE WATER $132,137 $500,000 Implemented
MI0209 # 05 Y:2011 05 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $112,996 $1,950 Implemented
MI0209 # 06 Y:2011 06 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $107,940 $330,568 Implemented
MI0209 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,204 $29,679 Implemented
MI0209 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,599 $1,320 Implemented
MI0209 # 09 Y:2011 09 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,681 $50 Implemented
MI0209 # 12 Y:2011 12 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $13,268 $3,200 Implemented
MI0209 # 14 Y:2011 14 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $5,235 $3,450 Implemented
MI0209 # 15 Y:2011 15 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $3,926 $3,450 Implemented
MI0193 # 02 Y:2010 02 2010 HEAT WATER WITH EXHAUST HEAT $100,762 $23,000 Implemented
MI0193 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,162 $63,083 Implemented
MI0193 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,000 $1,210 Implemented
MI0193 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,004 $40 Implemented
MI0193 # 07 Y:2010 07 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,182 $1,750 Implemented
UF0433 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,098 $314 Implemented
UF0433 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,205 $0 Implemented
UF0433 # 06 Y:2010 06 2010 DEVELOP A REPAIR/REPLACE POLICY $621 $0 Implemented
UF0433 # 07 Y:2010 07 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,610 $0 Implemented
UF0433 # 10 Y:2010 10 2010 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $1,885 $816 Implemented
MI0183 # 01 Y:2009 01 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,088 $1,360 Implemented
MI0183 # 05 Y:2009 05 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,481 $320 Implemented
MI0183 # 06 Y:2009 06 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,750 $1,500 Implemented
MI0183 # 08 Y:2009 08 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $133 $60 Implemented