IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,132

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0576 # 05 Y:2022 05 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $16,965 $25,427 Implemented
UF0576 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,147 $0 Implemented
UF0576 # 07 Y:2022 07 2022 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,306 $765 Implemented
UF0576 # 09 Y:2022 09 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,828 $2,002 Implemented
UF0576 # 10 Y:2022 10 2022 INCREASE AMOUNT OF CONDENSATE RETURNED $1,400 $1,449 Implemented
UF0576 # 12 Y:2022 12 2022 IMPROVE SPACE COMFORT CONDITIONING $19,893 $5,851 Implemented
LS2215 # 01 Y:2022 01 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $50,000 $0 Implemented
LS2215 # 02 Y:2022 02 2022 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $9,603 $1,118 Implemented
LS2215 # 03 Y:2022 03 2022 INSTALL SENSORS TO DETECT AND AVOID JAMS $72,450 $2,400 Implemented
LS2215 # 04 Y:2022 04 2022 INSTALL TIMERS AND/OR THERMOSTATS $631 $75 Implemented
LS2215 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,461 $270 Implemented
LS2215 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $247 $100 Implemented
LS2215 # 07 Y:2022 07 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $49,680 $58,020 Implemented
MZ0317 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,392 $12,626 Implemented
MZ0317 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $607 $800 Implemented
MZ0317 # 03 Y:2022 03 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,246 $4,000 Implemented
AM0844 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $101,477 $114,525 Implemented
AM0844 # 03 Y:2022 03 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $9,263 $3,900 Implemented
AM0844 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,138 $331 Implemented
AM0844 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $854 $625 Implemented
UL2203 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,530 $37,026 Implemented
UL2203 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,985 $0 Implemented
UL2203 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $79,271 $45,460 Implemented
KS2201 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,955 $5,480 Implemented
KS2201 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,137 $60 Implemented