Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,132
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0508 # 05 Y:2021 | 05 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,407 | $24,000 | Implemented |
NL0055 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $60,616 | $121,800 | Implemented |
NL0055 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $35,975 | $4,500 | Implemented |
NL0055 # 04 Y:2021 | 04 | 2021 | USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE | $3,858 | $146 | Implemented |
NL0055 # 05 Y:2021 | 05 | 2021 | IMPROVE HANDLING PRACTICES | $3,600 | $1,600 | Implemented |
NL0055 # 08 Y:2021 | 08 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $252 | $1,000 | Implemented |
MZ0309 # 01 Y:2021 | 01 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $65,174 | $960 | Implemented |
MZ0309 # 02 Y:2021 | 02 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,714 | $960 | Implemented |
MZ0309 # 04 Y:2021 | 04 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $11,649 | $4,200 | Implemented |
MZ0309 # 05 Y:2021 | 05 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,736 | $4,920 | Implemented |
MZ0309 # 07 Y:2021 | 07 | 2021 | OPTIMIZE PLANT POWER FACTOR | $354,701 | $442,138 | Implemented |
MI0386 # 02 Y:2021 | 02 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $19,620 | $43,782 | Implemented |
MI0386 # 04 Y:2021 | 04 | 2021 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $6,129 | $15,000 | Implemented |
MI0386 # 05 Y:2021 | 05 | 2021 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,559 | $1,827 | Implemented |
AS0505 # 01 Y:2021 | 01 | 2021 | USE LESS WASTEFUL PACKAGING | $178,199 | $183,215 | Implemented |
AS0505 # 05 Y:2021 | 05 | 2021 | KEEP EQUIPMENT CLEAN | $4,063 | $464 | Implemented |
UU0180 # 03 Y:2021 | 03 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,182 | $4,000 | Implemented |
UU0180 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,073 | $13,873 | Implemented |
UU0180 # 06 Y:2021 | 06 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $776 | $126 | Implemented |
UU0180 # 09 Y:2021 | 09 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $323 | $227 | Implemented |
UF0560 # 02 Y:2020 | 02 | 2020 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,454 | $5,998 | Implemented |
UF0560 # 04 Y:2020 | 04 | 2020 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,897 | $1,544 | Implemented |
UF0560 # 05 Y:2020 | 05 | 2020 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $1,841 | $378 | Implemented |
UF0560 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,156 | $306 | Implemented |
UF0560 # 08 Y:2020 | 08 | 2020 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $9,639 | $725 | Implemented |