Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
601
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0611 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $165,339 | $1,651,070 | Implemented |
SF0611 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $14,817 | $0 | Implemented |
SF0611 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $61,975 | $1,800 | Implemented |
SF0611 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,908 | $0 | Implemented |
SF0610 # 02 Y:2024 | 02 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $12,954 | $0 | Implemented |
SF0610 # 03 Y:2024 | 03 | 2024 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $32,003 | $15,909 | Implemented |
SF0610 # 04 Y:2024 | 04 | 2024 | HEAT WATER WITH EXHAUST HEAT | $36,485 | $30,037 | Implemented |
SF0610 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,683 | $31,050 | Implemented |
SF0610 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,215 | $0 | Implemented |
SF0610 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $8,502 | $10,799 | Implemented |
SF0608 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,322 | $0 | Implemented |
SF0608 # 08 Y:2023 | 08 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $39,597 | $29,794 | Implemented |
SF0608 # 03 Y:2023 | 03 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $29,842 | $690 | Implemented |
SF0608 # 01 Y:2023 | 01 | 2023 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $16,747 | $400 | Implemented |
SF0608 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,050 | $0 | Implemented |
SF0608 # 05 Y:2023 | 05 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $11,235 | $4,654 | Implemented |
SF0606 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,495 | $1,440 | Implemented |
SF0606 # 02 Y:2023 | 02 | 2023 | USE MINIMUM STEAM OPERATING PRESSURE | $5,475 | $60 | Implemented |
SF0606 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $1,107 | $564 | Implemented |
SF0606 # 05 Y:2023 | 05 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,502 | $8,173 | Implemented |
SF0606 # 04 Y:2023 | 04 | 2023 | INSULATE BARE EQUIPMENT | $5,279 | $5,910 | Implemented |
SJ0005 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,218 | $962 | Implemented |
SJ0005 # 06 Y:2023 | 06 | 2023 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $5,992 | $2,536 | Implemented |
SF0601 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,700 | $12,525 | Implemented |
SF0601 # 04 Y:2023 | 04 | 2023 | USE OPTIMUM THICKNESS INSULATION | $3,765 | $1,482 | Implemented |