Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0421 # 08 Y:2009 | 08 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $568 | $1,444 | Implemented |
SD0421 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,149 | $2,700 | Implemented |
SD0421 # 02 Y:2009 | 02 | 2009 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $35,684 | $50,000 | Implemented |
SD0419 # 01 Y:2009 | 01 | 2009 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $17,800 | $10,000 | Implemented |
SD0419 # 02 Y:2009 | 02 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,170 | $1,000 | Implemented |
SD0419 # 04 Y:2009 | 04 | 2009 | INCREASE AMOUNT OF CONDENSATE RETURNED | $15,940 | $2,263 | Implemented |
SD0419 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49,905 | $161,162 | Implemented |
SD0416 # 06 Y:2009 | 06 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $485 | $0 | Implemented |
SD0416 # 05 Y:2009 | 05 | 2009 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $655 | $0 | Implemented |
SD0416 # 03 Y:2009 | 03 | 2009 | USE PHOTOCELL CONTROLS | $3,458 | $4,950 | Implemented |
SD0416 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,893 | $5,295 | Implemented |
SD0416 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,133 | $35,628 | Implemented |
SF0374 # 14 Y:2009 | 14 | 2009 | INSTALL OCCUPANCY SENSORS | $701 | $1,567 | Implemented |
SF0374 # 01 Y:2009 | 01 | 2009 | REPAIR AND ELIMINATE STEAM LEAKS | $45,410 | $0 | Implemented |
SF0374 # 13 Y:2009 | 13 | 2009 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,217 | $4,719 | Implemented |
SF0374 # 12 Y:2009 | 12 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,489 | $4,385 | Implemented |
SF0374 # 11 Y:2009 | 11 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,553 | $5,659 | Implemented |
SF0374 # 10 Y:2009 | 10 | 2009 | USE PHOTOCELL CONTROLS | $18,403 | $18,196 | Implemented |
SF0374 # 09 Y:2009 | 09 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $51,835 | $40,007 | Implemented |
SF0374 # 08 Y:2009 | 08 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $48,237 | $33,968 | Implemented |
SF0374 # 07 Y:2009 | 07 | 2009 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $17,939 | $12,500 | Implemented |
SF0374 # 06 Y:2009 | 06 | 2009 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $15,888 | $9,574 | Implemented |
SF0374 # 05 Y:2009 | 05 | 2009 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $5,402 | $3,037 | Implemented |
SF0374 # 04 Y:2009 | 04 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,963 | $2,837 | Implemented |
SF0374 # 03 Y:2009 | 03 | 2009 | REDUCE EXCESSIVE BOILER BLOWDOWN | $10,627 | $2,372 | Implemented |