Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
127
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0975 # 07 Y:2024 | 07 | 2024 | MINIMIZE WATER USAGE | $64,161 | $237,800 | Implemented |
GT0975 # 06 Y:2024 | 06 | 2024 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $4,603 | $11,665 | Implemented |
GT0975 # 05 Y:2024 | 05 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $770 | $1,850 | Implemented |
GT0965 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,164 | $800 | Implemented |
GT0965 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $281 | $927 | Implemented |
GT0965 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $34,014 | $1,850 | Implemented |
GT0964 # 04 Y:2023 | 04 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $18,786 | $50,570 | Implemented |
GT0964 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $78,169 | $1,850 | Implemented |
GT0960 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,810 | $1,850 | Implemented |
GT0960 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,666 | $8,719 | Implemented |
GT0960 # 02 Y:2021 | 02 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,573 | $800 | Implemented |
UF0576 # 06 Y:2022 | 06 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,147 | $0 | Implemented |
UF0576 # 11 Y:2022 | 11 | 2022 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $284,508 | $0 | Implemented |
UF0576 # 10 Y:2022 | 10 | 2022 | INCREASE AMOUNT OF CONDENSATE RETURNED | $1,400 | $1,449 | Implemented |
UF0576 # 09 Y:2022 | 09 | 2022 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,828 | $2,002 | Implemented |
UF0576 # 02 Y:2022 | 02 | 2022 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $30,987 | $10,183 | Implemented |
UF0576 # 07 Y:2022 | 07 | 2022 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $5,306 | $765 | Implemented |
UF0576 # 04 Y:2022 | 04 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $21,495 | $6,314 | Implemented |
UF0576 # 03 Y:2022 | 03 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $29,479 | $16,283 | Implemented |
UF0576 # 05 Y:2022 | 05 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $16,965 | $25,427 | Implemented |
UF0576 # 12 Y:2022 | 12 | 2022 | IMPROVE SPACE COMFORT CONDITIONING | $19,893 | $5,851 | Implemented |
UF0576 # 01 Y:2022 | 01 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $55,456 | $51,203 | Implemented |
KS2201 # 09 Y:2022 | 09 | 2022 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $13,164 | $120 | Implemented |
KS2201 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,955 | $5,480 | Implemented |
KS2201 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,572 | $61,880 | Implemented |