IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

171

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0341 # 03 Y:2023 03 2023 DIRECT WARMEST AIR TO COMBUSTION INTAKE $12,536 $16,400 Not Implemented
MZ0341 # 02 Y:2023 02 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,839 $3,000 Not Implemented
MZ0341 # 01 Y:2023 01 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,080 $9,000 Not Implemented
MZ0341 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,207 $160 Not Implemented
TT0291 # 01 Y:2023 01 2023 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $44,264 $3,287 Not Implemented
TT0291 # 04 Y:2023 04 2023 USE OPTIMUM THICKNESS INSULATION $14,929 $45,390 Not Implemented
TT0291 # 03 Y:2023 03 2023 PURCHASE APPROPRIATELY SIZED MATERIAL $18,022 $87,000 Not Implemented
TT0291 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,378 $10,100 Implemented
TT0291 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,663 $1,500 Implemented
TT0291 # 06 Y:2023 06 2023 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $2,088 $4,500 Not Implemented
LT8363 # 04 Y:2022 04 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $14,468 $15,975 n/a
LT8363 # 06 Y:2022 06 2022 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $23,817 $51,385 n/a
LT8363 # 02 Y:2022 02 2022 CHANGE OPERATING CONDITIONS $46,622 $0 n/a
LT8363 # 05 Y:2022 05 2022 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $22,308 $32,500 n/a
LT8363 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $5,980 $10,022 n/a
LT8363 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,542 $2,945 n/a
LT8363 # 07 Y:2022 07 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,254 $0 n/a
OK0953 # 01 Y:2016 01 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,868 $150 Not Implemented
OK0953 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,120 $11,488 Implemented
OK0953 # 04 Y:2016 04 2016 USE RADIANT HEATER FOR SPOT HEATING $9,116 $27,880 Not Implemented
OK0953 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $6,882 $3,675 Not Implemented
OK0926 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,061 $100,000 Not Implemented
OK0926 # 01 Y:2015 01 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $8,746 $28,000 Not Implemented
OK0926 # 03 Y:2015 03 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,134 $0 Not Implemented
OK0926 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,480 $22,750 Implemented