IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

352

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0866 # 14 Y:2012 14 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,212 $8,000 Not Implemented
UD0866 # 15 Y:2012 15 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $9,098 $10,982 Implemented
UD0866 # 16 Y:2012 16 2012 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $7,283 $15,600 Not Implemented
UD0839 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,985 $5,668 Implemented
UD0839 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $1,620 $1,875 Not Implemented
UD0839 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $58,395 $500 Implemented
UD0839 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,472 $0 Implemented
UD0839 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,623 $5,000 Not Implemented
UD0839 # 06 Y:2011 06 2011 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $80,401 $90,000 Not Implemented
UD0839 # 07 Y:2011 07 2011 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $29,882 $59,764 Not Implemented
UD0839 # 08 Y:2011 08 2011 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $80,401 $90,000 Not Implemented
UD0839 # 09 Y:2011 09 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,418 $3,000 Implemented
UD0839 # 10 Y:2011 10 2011 OPERATE BOILERS ON HIGH FIRE SETTING $11,810 $23,620 Implemented
UD0839 # 11 Y:2011 11 2011 REPAIR AND ELIMINATE STEAM LEAKS $5,425 $2,100 Implemented
UD0839 # 12 Y:2011 12 2011 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,987 $993 Implemented
UD0839 # 13 Y:2011 13 2011 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $48,911 $75,000 Implemented
UD0839 # 14 Y:2011 14 2011 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $3,732 $25 Not Implemented
UD0836 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,705 $2,196 Not Implemented
UD0836 # 02 Y:2011 02 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,796 $36 Not Implemented
UD0836 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,689 $7,000 Not Implemented
UD0836 # 04 Y:2011 04 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $37,847 $32,000 Not Implemented
UD0836 # 05 Y:2011 05 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,178 $1,000 Not Implemented
UD0836 # 06 Y:2011 06 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $1,960 $1,140 Not Implemented
UD0836 # 07 Y:2011 07 2011 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $12,875 $15,000 Not Implemented
UD0836 # 08 Y:2011 08 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,572 $99,100 Not Implemented