IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,485

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0912 # 13 Y:2015 13 2015 INSULATE BARE EQUIPMENT $18,908 $74,880 Not Implemented
OK0910 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $8,390 $2,440 Not Implemented
OK0910 # 02 Y:2015 02 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $42,177 $162,050 Not Implemented
OK0910 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,309 $1,250 Implemented
OK0910 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,605 $6,953 Not Implemented
OK0910 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $70,459 $247,939 Implemented
OK0910 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,664 $8,092 Not Implemented
OK0910 # 07 Y:2015 07 2015 INSTALL TIMERS AND/OR THERMOSTATS $2,710 $2,471 Implemented
OK0910 # 08 Y:2015 08 2015 REPAIR AND ELIMINATE STEAM LEAKS $18,886 $375 Implemented
OK0910 # 09 Y:2015 09 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $53,631 $44,000 Not Implemented
OK0910 # 10 Y:2015 10 2015 INSULATE BARE EQUIPMENT $317 $46 Not Implemented
OK0910 # 11 Y:2015 11 2015 OPTIMIZE PLANT POWER FACTOR $11,042 $47,988 Not Implemented
OR0647 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,826 $4,986 Implemented
OR0647 # 02 Y:2015 02 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $8,293 $800 Not Implemented
OR0647 # 03 Y:2015 03 2015 IMPROVE COMBUSTION CONTROL CAPABILITY $8,286 $7,123 Not Implemented
OR0647 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,576 $25,575 Implemented
SD0499 # 01 Y:2015 01 2015 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $72,145 $170,000 Not Implemented
SD0499 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,182 $200 Implemented
SD0499 # 03 Y:2015 03 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $904 $3,025 Implemented
SD0499 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $412 $1,300 Implemented
SD0499 # 05 Y:2015 05 2015 INSULATE BARE EQUIPMENT $289 $975 Not Implemented
SU0385 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,815 $0 Implemented
SU0385 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,452 $1,124 Implemented
SU0385 # 03 Y:2015 03 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,387 $210 Not Implemented
SU0385 # 04 Y:2015 04 2015 INSULATE BARE EQUIPMENT $2,578 $370 Implemented