Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,485
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1406 # 04 Y:2014 | 04 | 2014 | INSULATE BARE EQUIPMENT | $930 | $1,845 | Implemented |
UK1406 # 05 Y:2014 | 05 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $13,621 | $15,000 | Implemented |
UK1406 # 06 Y:2014 | 06 | 2014 | OPTIMIZE PLANT POWER FACTOR | $7,546 | $34,475 | Not Implemented |
UK1406 # 07 Y:2014 | 07 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,190 | $0 | Implemented |
UK1406 # 08 Y:2014 | 08 | 2014 | ADD AREA LIGHTING SWITCHES | $1,572 | $620 | Implemented |
UK1406 # 09 Y:2014 | 09 | 2014 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $2,736 | $2,479 | Implemented |
UK1406 # 10 Y:2014 | 10 | 2014 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $612 | $2,154 | Implemented |
UK1406 # 11 Y:2014 | 11 | 2014 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $100 | $90 | Implemented |
UK1406 # 12 Y:2014 | 12 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,015 | $700 | Implemented |
MZ0155 # 01 Y:2014 | 01 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,080 | $1,350 | Not Implemented |
MZ0155 # 02 Y:2014 | 02 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,171 | $1,000 | Not Implemented |
MZ0155 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,118 | $1,525 | Not Implemented |
MZ0155 # 04 Y:2014 | 04 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,228 | $750 | Not Implemented |
MI0267 # 01 Y:2014 | 01 | 2014 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $18,615 | $80,000 | Implemented |
MI0267 # 02 Y:2014 | 02 | 2014 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $14,962 | $2,560 | Not Implemented |
MI0267 # 03 Y:2014 | 03 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,086 | $80 | Not Implemented |
MI0267 # 04 Y:2014 | 04 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $5,029 | $3,340 | Implemented |
MI0267 # 05 Y:2014 | 05 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,950 | $429 | Implemented |
MI0267 # 06 Y:2014 | 06 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,765 | $3,600 | Not Implemented |
MI0267 # 07 Y:2014 | 07 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,203 | $760 | Not Implemented |
MI0267 # 08 Y:2014 | 08 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,006 | $80 | Not Implemented |
MI0267 # 09 Y:2014 | 09 | 2014 | MINIMIZE WATER USAGE | $1,960 | $1,930 | Not Implemented |
MI0267 # 10 Y:2014 | 10 | 2014 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $1,873 | $8,000 | Not Implemented |
MI0267 # 11 Y:2014 | 11 | 2014 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,235 | $2,100 | Not Implemented |
MI0267 # 12 Y:2014 | 12 | 2014 | INSULATE BARE EQUIPMENT | $644 | $1,410 | Not Implemented |