Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
610
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0193 # 02 Y:2010 | 02 | 2010 | HEAT WATER WITH EXHAUST HEAT | $100,762 | $23,000 | Implemented |
MI0193 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $58,162 | $63,083 | Implemented |
MI0193 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,000 | $1,210 | Implemented |
MI0193 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,004 | $40 | Implemented |
MI0193 # 06 Y:2010 | 06 | 2010 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,565 | $4,531 | Not Implemented |
MI0193 # 07 Y:2010 | 07 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,182 | $1,750 | Implemented |
UF0433 # 01 Y:2010 | 01 | 2010 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,771 | $2,321 | Not Implemented |
UF0433 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,098 | $314 | Implemented |
UF0433 # 03 Y:2010 | 03 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,138 | $8,558 | Not Implemented |
UF0433 # 04 Y:2010 | 04 | 2010 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $21,987 | $10,000 | Not Implemented |
UF0433 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,205 | $0 | Implemented |
UF0433 # 06 Y:2010 | 06 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $621 | $0 | Implemented |
UF0433 # 07 Y:2010 | 07 | 2010 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,610 | $0 | Implemented |
UF0433 # 08 Y:2010 | 08 | 2010 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,722 | $6,350 | Not Implemented |
UF0433 # 09 Y:2010 | 09 | 2010 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $23,836 | $4,000 | Not Implemented |
UF0433 # 10 Y:2010 | 10 | 2010 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $1,885 | $816 | Implemented |
MI0183 # 01 Y:2009 | 01 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $11,088 | $1,360 | Implemented |
MI0183 # 02 Y:2009 | 02 | 2009 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $5,816 | $1,280 | Not Implemented |
MI0183 # 03 Y:2009 | 03 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,012 | $1,200 | Not Implemented |
MI0183 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,501 | $2,320 | Not Implemented |
MI0183 # 05 Y:2009 | 05 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,481 | $320 | Implemented |
MI0183 # 06 Y:2009 | 06 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,750 | $1,500 | Implemented |
MI0183 # 07 Y:2009 | 07 | 2009 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $198 | $180 | Not Implemented |
MI0183 # 08 Y:2009 | 08 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $133 | $60 | Implemented |
UF0426 # 01 Y:2009 | 01 | 2009 | CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS | $20,276 | $4,000 | Not Implemented |