Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
610
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0412 # 04 Y:2008 | 04 | 2008 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $1,855 | $795 | Not Implemented |
UF0412 # 05 Y:2008 | 05 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $17,781 | $615 | Implemented |
UF0412 # 06 Y:2008 | 06 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $2,521 | $0 | Implemented |
UF0412 # 07 Y:2008 | 07 | 2008 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $2,081 | $534 | Not Implemented |
UF0412 # 08 Y:2008 | 08 | 2008 | INSTALL SET-BACK TIMERS | $15,103 | $4,916 | Implemented |
UF0412 # 09 Y:2008 | 09 | 2008 | CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS | $1,822 | $10,480 | Implemented |
UF0412 # 10 Y:2008 | 10 | 2008 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $95,676 | $20,000 | Not Implemented |
UF0412 # 11 Y:2008 | 11 | 2008 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $9,359 | $4,246 | Implemented |
MI0155 # 01 Y:2007 | 01 | 2007 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $66,401 | $120,000 | Not Implemented |
MI0155 # 02 Y:2007 | 02 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $51,399 | $22,558 | Not Implemented |
MI0155 # 03 Y:2007 | 03 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $31,061 | $2,665 | Not Implemented |
MI0155 # 04 Y:2007 | 04 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,549 | $23,640 | Not Implemented |
MI0155 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,901 | $27,300 | Not Implemented |
MI0155 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,760 | $1,074 | Not Implemented |
MI0155 # 07 Y:2007 | 07 | 2007 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $7,524 | $7,800 | Not Implemented |
MI0155 # 08 Y:2007 | 08 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,179 | $30 | Not Implemented |
MI0155 # 09 Y:2007 | 09 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,909 | $180 | Not Implemented |
MI0155 # 10 Y:2007 | 10 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,610 | $3,010 | Not Implemented |
MI0147 # 01 Y:2007 | 01 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $20,581 | $16,000 | Implemented |
MI0147 # 02 Y:2007 | 02 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,498 | $1,750 | Implemented |
MI0147 # 03 Y:2007 | 03 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,305 | $7,878 | Implemented |
MI0147 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,950 | $1,074 | Not Implemented |
MI0147 # 05 Y:2007 | 05 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $481 | $30 | Not Implemented |
UF0400 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,632 | $9,727 | Implemented |
UF0400 # 02 Y:2007 | 02 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,731 | $0 | Not Implemented |