IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0267 # 03 Y:2022 03 2022 INSTALL TIMERS AND/OR THERMOSTATS $2,954 $1,360 Implemented
UA0266 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $894 $558 Not Implemented
UA0266 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $17,514 $8,397 Not Implemented
UA0266 # 04 Y:2022 04 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,089 $188 Not Implemented
UA0266 # 03 Y:2022 03 2022 INSTALL TIMERS AND/OR THERMOSTATS $1,950 $865 Not Implemented
UA0266 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,871 $22,132 Not Implemented
UA0266 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,219 $1,000 Not Implemented
UA0265 # 05 Y:2022 05 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $33,503 $34,984 Not Implemented
UA0265 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $14,987 $4,205 Not Implemented
UA0265 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,413 $5,533 Not Implemented
UA0265 # 02 Y:2022 02 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,737 $23,601 Not Implemented
UA0265 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,134 $400 Not Implemented
UA0227 # 06 Y:2020 06 2020 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,578 $200 Not Implemented
UA0227 # 05 Y:2020 05 2020 RECOVER WASTE HEAT FROM EQUIPMENT $45,805 $100,000 Not Implemented
UA0227 # 04 Y:2020 04 2020 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $65,276 $72,800 Implemented
UA0227 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,527 $250 Not Implemented
UA0227 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,466 $1,345 Implemented
UA0227 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,028 $2,600 Not Implemented
UA0227 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,570 $5,639 Implemented
UA0195 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,589 $2,465 Implemented
UA0195 # 06 Y:2018 06 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,967 $70,000 Not Implemented
UA0195 # 03 Y:2018 03 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,189 $19,100 Not Implemented
UA0195 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,429 $11,536 Implemented
UA0195 # 01 Y:2018 01 2018 RECOVER WASTE HEAT FROM EQUIPMENT $186,843 $100,000 Not Implemented
UA0195 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,476 $500 Implemented