Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,392
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0470 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,220 | $4,488 | Implemented |
SF0470 # 02 Y:2015 | 02 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,421 | $3,541 | Implemented |
SF0470 # 03 Y:2015 | 03 | 2015 | INCREASE AMOUNT OF CONDENSATE RETURNED | $26,563 | $30,811 | Implemented |
SF0470 # 04 Y:2015 | 04 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,546 | $11,844 | Implemented |
SF0470 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,206 | $17,797 | Implemented |
SF0470 # 06 Y:2015 | 06 | 2015 | USE SOLAR HEAT TO MAKE ELECTRICTY | $91,176 | $450,224 | Implemented |
SD0499 # 01 Y:2015 | 01 | 2015 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $72,145 | $170,000 | Not Implemented |
SD0499 # 02 Y:2015 | 02 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,182 | $200 | Implemented |
SD0499 # 03 Y:2015 | 03 | 2015 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $904 | $3,025 | Implemented |
SD0499 # 04 Y:2015 | 04 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $412 | $1,300 | Implemented |
SD0499 # 05 Y:2015 | 05 | 2015 | INSULATE BARE EQUIPMENT | $289 | $975 | Not Implemented |
SF0464 # 01 Y:2015 | 01 | 2015 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $884 | $0 | Implemented |
SF0464 # 02 Y:2015 | 02 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,004 | $2,118 | Implemented |
SF0464 # 03 Y:2015 | 03 | 2015 | ADD AREA LIGHTING SWITCHES | $6,212 | $2,837 | Implemented |
SF0459 # 01 Y:2015 | 01 | 2015 | REPAIR OR REPLACE STEAM TRAPS | $29,918 | $5,047 | Implemented |
SF0459 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $391 | $0 | Implemented |
SF0459 # 03 Y:2015 | 03 | 2015 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $196,316 | $40,788 | Not Implemented |
SF0459 # 04 Y:2015 | 04 | 2015 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $41,206 | $19,989 | Not Implemented |
SF0459 # 05 Y:2015 | 05 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,624 | $15,013 | Not Implemented |
SF0459 # 06 Y:2015 | 06 | 2015 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $23,360 | $14,429 | Implemented |
SF0459 # 07 Y:2015 | 07 | 2015 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $3,292 | $1,945 | Implemented |
SF0459 # 08 Y:2015 | 08 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $16,977 | $11,607 | Not Implemented |
SF0459 # 09 Y:2015 | 09 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,959 | $6,271 | Not Implemented |
SF0459 # 10 Y:2015 | 10 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,935 | $5,491 | Not Implemented |
SF0459 # 11 Y:2015 | 11 | 2015 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $17,754 | $22,786 | Implemented |