IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,485

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0172 # 08 Y:2010 08 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,552 $0 Not Implemented
IC0172 # 09 Y:2010 09 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,810 $0 Not Implemented
IC0172 # 10 Y:2010 10 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $490 $0 Not Implemented
IC0172 # 11 Y:2010 11 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,144,671 $1,170,000 Not Implemented
IC0172 # 12 Y:2010 12 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $504 $0 Not Implemented
AM0581 # 01 Y:2010 01 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,089 $51,900 Not Implemented
OR0557 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $15,806 $14,882 Not Implemented
OR0557 # 02 Y:2010 02 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,866 $6,763 Not Implemented
OR0557 # 03 Y:2010 03 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,416 $500 Not Implemented
OR0557 # 04 Y:2010 04 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,893 $3,858 Not Implemented
OR0557 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,655 $1,655 Not Implemented
OR0557 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,035 $3,858 Not Implemented
OR0557 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,471 $1,471 Not Implemented
OR0557 # 08 Y:2010 08 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $615 $353 Not Implemented
OR0557 # 09 Y:2010 09 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $23,079 $87,827 Not Implemented
UA0053 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,526 $53,770 Not Implemented
UA0053 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,266 $13,725 Not Implemented
UA0053 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $2,400 $1,080 Not Implemented
UA0053 # 04 Y:2010 04 2010 USE PHOTOCELL CONTROLS $218 $177 Implemented
UA0053 # 05 Y:2010 05 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $351 $906 Implemented
UA0053 # 06 Y:2010 06 2010 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $4,505 $1,000 Implemented
UA0053 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $12,870 $26,550 Not Implemented
UA0053 # 08 Y:2010 08 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,306 $7,045 Not Implemented
UA0053 # 09 Y:2010 09 2010 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $27,920 $8,875 Not Implemented
OK0791 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $65,369 $268,762 Not Implemented