IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,392

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0457 # 12 Y:2012 12 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,808 $200 Not Implemented
SD0457 # 13 Y:2012 13 2012 USE MINIMUM STEAM OPERATING PRESSURE $781 $200 Not Implemented
SF0419 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $637 $80 Implemented
SF0419 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,754 $2,287 Not Implemented
SF0419 # 03 Y:2012 03 2012 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $1,176 $963 Not Implemented
SF0419 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,431 $16,162 Implemented
SF0419 # 05 Y:2012 05 2012 INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM $8,615 $42,287 Not Implemented
SF0419 # 06 Y:2012 06 2012 HEAT WATER WITH EXHAUST HEAT $5,628 $35,328 Not Implemented
SD0455 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,382 $200 Not Implemented
SD0455 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,441 $5,300 Not Implemented
SD0455 # 03 Y:2012 03 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,465 $2,530 Not Implemented
SD0455 # 04 Y:2012 04 2012 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $706 $252 Not Implemented
SD0455 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $1,808 $1,295 Not Implemented
SD0455 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $5,541 $4,213 Not Implemented
SD0455 # 07 Y:2012 07 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,146 $3,112 Not Implemented
SD0455 # 08 Y:2012 08 2012 INSULATE FEEDWATER TANK $2,266 $2,574 Not Implemented
SD0455 # 09 Y:2012 09 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,156 $7,124 Not Implemented
SD0455 # 10 Y:2012 10 2012 USE PHOTOCELL CONTROLS $1,606 $2,550 Not Implemented
SD0450 # 01 Y:2012 01 2012 USE MINIMUM STEAM OPERATING PRESSURE $8,111 $200 Not Implemented
SD0450 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,795 $200 Not Implemented
SD0450 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,833 $1,900 Not Implemented
SD0450 # 04 Y:2012 04 2012 USE PHOTOCELL CONTROLS $1,297 $3,550 Not Implemented
SD0450 # 05 Y:2012 05 2012 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $8,500 $25,000 Not Implemented
SF0413 # 01 Y:2012 01 2012 COMBINE UTILITY METERS $27,096 $10,000 Not Implemented
SF0413 # 02 Y:2012 02 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $936 $380 Implemented