IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,562

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0520 # 07 Y:2007 07 2007 INSULATE FEEDWATER TANK $3,400 $2,160 Implemented
SF0346 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,744 $100 Implemented
SF0346 # 02 Y:2007 02 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $474 $262 Not Implemented
SF0346 # 03 Y:2007 03 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,014 $1,859 Not Implemented
SF0346 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $1,284 $1,620 Not Implemented
SF0346 # 05 Y:2007 05 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,090 $11,740 Not Implemented
SF0346 # 06 Y:2007 06 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,037 $1,863 Not Implemented
SF0346 # 07 Y:2007 07 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $96,586 $193,493 Not Implemented
SF0346 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $721 $1,875 Not Implemented
MI0155 # 01 Y:2007 01 2007 UTILIZE A LESS EXPENSIVE COOLING METHOD $66,401 $120,000 Not Implemented
MI0155 # 02 Y:2007 02 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $51,399 $22,558 Not Implemented
MI0155 # 03 Y:2007 03 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $31,061 $2,665 Not Implemented
MI0155 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,549 $23,640 Not Implemented
MI0155 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,901 $27,300 Not Implemented
MI0155 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,760 $1,074 Not Implemented
MI0155 # 07 Y:2007 07 2007 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $7,524 $7,800 Not Implemented
MI0155 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,179 $30 Not Implemented
MI0155 # 09 Y:2007 09 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,909 $180 Not Implemented
MI0155 # 10 Y:2007 10 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,610 $3,010 Not Implemented
MI0153 # 01 Y:2007 01 2007 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $342,569 $290,000 Not Implemented
MI0153 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,866 $54,000 Not Implemented
MI0153 # 03 Y:2007 03 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,256 $260 Not Implemented
MI0153 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,348 $1,074 Not Implemented
MI0153 # 05 Y:2007 05 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $628 $2,610 Not Implemented
UA0005 # 01 Y:2007 01 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $2,346 $620 Not Implemented