Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,562
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0342 # 02 Y:2007 | 02 | 2007 | AVOID FROST FORMATION ON EVAPORATORS | $86,147 | $41,628 | Not Implemented |
SF0342 # 03 Y:2007 | 03 | 2007 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $8,746 | $7,500 | Implemented |
SF0342 # 04 Y:2007 | 04 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,598 | $1,412 | Not Implemented |
SF0342 # 05 Y:2007 | 05 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,282 | $34,413 | Not Implemented |
SF0342 # 06 Y:2007 | 06 | 2007 | INSTALL OCCUPANCY SENSORS | $17,040 | $25,438 | Not Implemented |
SF0342 # 07 Y:2007 | 07 | 2007 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $14,176 | $22,780 | Implemented |
SF0342 # 08 Y:2007 | 08 | 2007 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $130,413 | $250,000 | Not Implemented |
SF0342 # 09 Y:2007 | 09 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,865 | $13,500 | Not Implemented |
SF0342 # 10 Y:2007 | 10 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,677 | $54,912 | Implemented |
SF0342 # 11 Y:2007 | 11 | 2007 | REDUCE EXCESSIVE BOILER BLOWDOWN | $1,536 | $5,000 | Not Implemented |
AM0529 # 01 Y:2007 | 01 | 2007 | INSTALL HYDROGEN FUEL CELL | $59,020 | $250,000 | Not Implemented |
AM0529 # 02 Y:2007 | 02 | 2007 | OPTIMIZE PLANT POWER FACTOR | $41,500 | $86,400 | Implemented |
AM0529 # 03 Y:2007 | 03 | 2007 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $18,360 | $8,240 | Not Implemented |
AM0529 # 04 Y:2007 | 04 | 2007 | USE SOLAR HEAT TO MAKE ELECTRICTY | $3,210 | $52,600 | Not Implemented |
AM0529 # 05 Y:2007 | 05 | 2007 | INSTALL OCCUPANCY SENSORS | $3,110 | $2,165 | Implemented |
AM0529 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,160 | $360 | Implemented |
AM0529 # 07 Y:2007 | 07 | 2007 | USE SYNTHETIC LUBRICANT | $2,027 | $0 | Not Implemented |
AM0529 # 08 Y:2007 | 08 | 2007 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $968 | $0 | Implemented |
UF0398 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,081 | $134,669 | Not Implemented |
UF0398 # 02 Y:2007 | 02 | 2007 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $940 | $0 | Not Implemented |
UF0398 # 03 Y:2007 | 03 | 2007 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $477 | $150 | Not Implemented |
UF0398 # 04 Y:2007 | 04 | 2007 | INSTALL OCCUPANCY SENSORS | $806 | $118 | Not Implemented |
UF0398 # 05 Y:2007 | 05 | 2007 | REPAIR OR REPLACE STEAM TRAPS | $4,676 | $218 | Not Implemented |
UF0398 # 06 Y:2007 | 06 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,060 | $1,600 | Not Implemented |
UF0398 # 07 Y:2007 | 07 | 2007 | USE OPTIMUM THICKNESS INSULATION | $32,078 | $6,105 | Not Implemented |