IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,562

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0398 # 08 Y:2007 08 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $547 $0 Not Implemented
UF0398 # 09 Y:2007 09 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,769 $19,429 Not Implemented
UF0398 # 10 Y:2007 10 2007 OPTIMIZE PLANT POWER FACTOR $209,563 $17,000 Not Implemented
UM0318 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,540 $14,000 Implemented
UM0318 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,573 $7,025 Not Implemented
UM0318 # 03 Y:2007 03 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,279 $0 Implemented
UM0318 # 04 Y:2007 04 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,947 $4,500 Implemented
UM0318 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,647 $120 Implemented
UM0318 # 06 Y:2007 06 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,516 $1,650 Not Implemented
UM0318 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,215 $75 Implemented
UM0318 # 08 Y:2007 08 2007 INSULATE BARE EQUIPMENT $766 $454 Not Implemented
MA0614 # 01 Y:2007 01 2007 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $16,978 $5,000 Implemented
MA0614 # 02 Y:2007 02 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,036 $8,400 Implemented
MA0614 # 03 Y:2007 03 2007 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $12,870 $0 Implemented
MA0614 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,118 $1,600 Implemented
MA0614 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,416 $9,000 Not Implemented
MA0614 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,749 $31,477 Implemented
MA0614 # 07 Y:2007 07 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,376 $20,000 Not Implemented
IC0125 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $202,850 $475,200 Not Implemented
IC0125 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $305,019 $900,000 Not Implemented
IC0125 # 03 Y:2007 03 2007 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $227,690 $372,000 Not Implemented
IC0125 # 04 Y:2007 04 2007 USE MINIMUM STEAM OPERATING PRESSURE $611 $0 Implemented
IC0125 # 05 Y:2007 05 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $36,000 $0 Not Implemented
IC0125 # 06 Y:2007 06 2007 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $21,910 $4,260 Not Implemented
IC0125 # 07 Y:2007 07 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $25,485 $4,800 Implemented