Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,562
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0398 # 08 Y:2007 | 08 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $547 | $0 | Not Implemented |
UF0398 # 09 Y:2007 | 09 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,769 | $19,429 | Not Implemented |
UF0398 # 10 Y:2007 | 10 | 2007 | OPTIMIZE PLANT POWER FACTOR | $209,563 | $17,000 | Not Implemented |
UM0318 # 01 Y:2007 | 01 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,540 | $14,000 | Implemented |
UM0318 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,573 | $7,025 | Not Implemented |
UM0318 # 03 Y:2007 | 03 | 2007 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,279 | $0 | Implemented |
UM0318 # 04 Y:2007 | 04 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,947 | $4,500 | Implemented |
UM0318 # 05 Y:2007 | 05 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,647 | $120 | Implemented |
UM0318 # 06 Y:2007 | 06 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,516 | $1,650 | Not Implemented |
UM0318 # 07 Y:2007 | 07 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,215 | $75 | Implemented |
UM0318 # 08 Y:2007 | 08 | 2007 | INSULATE BARE EQUIPMENT | $766 | $454 | Not Implemented |
MA0614 # 01 Y:2007 | 01 | 2007 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $16,978 | $5,000 | Implemented |
MA0614 # 02 Y:2007 | 02 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,036 | $8,400 | Implemented |
MA0614 # 03 Y:2007 | 03 | 2007 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $12,870 | $0 | Implemented |
MA0614 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,118 | $1,600 | Implemented |
MA0614 # 05 Y:2007 | 05 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,416 | $9,000 | Not Implemented |
MA0614 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,749 | $31,477 | Implemented |
MA0614 # 07 Y:2007 | 07 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,376 | $20,000 | Not Implemented |
IC0125 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $202,850 | $475,200 | Not Implemented |
IC0125 # 02 Y:2007 | 02 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $305,019 | $900,000 | Not Implemented |
IC0125 # 03 Y:2007 | 03 | 2007 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $227,690 | $372,000 | Not Implemented |
IC0125 # 04 Y:2007 | 04 | 2007 | USE MINIMUM STEAM OPERATING PRESSURE | $611 | $0 | Implemented |
IC0125 # 05 Y:2007 | 05 | 2007 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $36,000 | $0 | Not Implemented |
IC0125 # 06 Y:2007 | 06 | 2007 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $21,910 | $4,260 | Not Implemented |
IC0125 # 07 Y:2007 | 07 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $25,485 | $4,800 | Implemented |