IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

188

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0179 # 07 Y:2021 07 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $617 $50 Not Implemented
UU0179 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,013 $6,614 Implemented
UU0179 # 05 Y:2021 05 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,131 $100 Implemented
UU0179 # 04 Y:2021 04 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,472 $8,300 Not Implemented
UU0179 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,891 $1,233 Not Implemented
UU0179 # 02 Y:2021 02 2021 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $27,935 $2,000 Implemented
UU0179 # 01 Y:2021 01 2021 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $72,600 $4,000 Not Implemented
UU0161 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,780 $6,880 Implemented
UU0161 # 05 Y:2020 05 2020 ISOLATE HOT OR COLD EQUIPMENT $2,460 $9,000 Not Implemented
UU0161 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,370 $5,370 Not Implemented
UU0161 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,315 $7,880 Implemented
UU0161 # 02 Y:2020 02 2020 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $22,840 $53,000 Implemented
UU0161 # 01 Y:2020 01 2020 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $43,260 $86,000 Implemented
UU0160 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,050 $179,660 Implemented
UU0160 # 01 Y:2020 01 2020 INCREASE AMOUNT OF CONDENSATE RETURNED $47,740 $212,490 Implemented
UU0160 # 03 Y:2020 03 2020 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $30,330 $4,800 Not Implemented
UU0160 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN WATER LINES AND VALVES $14,460 $13,100 Implemented
UU0160 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $960 $1,140 Not Implemented
UU0160 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,220 $23,540 Implemented
UU0160 # 07 Y:2020 07 2020 Hire Energy Manager $50,000 $2,700 Not Implemented
UU0151 # 01 Y:2019 01 2019 OPERATE BOILERS ON HIGH FIRE SETTING $63,057 $1,000 Not Implemented
UU0151 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $17,315 $25,000 Not Implemented
UU0151 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,711 $37,970 Not Implemented
UU0151 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,969 $1,000 Not Implemented
UU0151 # 06 Y:2019 06 2019 INSTALL OCCUPANCY SENSORS $1,973 $7,800 Not Implemented