Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,562
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0057 # 07 Y:2004 | 07 | 2004 | INSTALL TURBULATORS | $1,680 | $1,747 | Not Implemented |
UU0057 # 08 Y:2004 | 08 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,320 | $809 | Not Implemented |
UU0057 # 09 Y:2004 | 09 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,920 | $0 | Implemented |
UU0057 # 10 Y:2004 | 10 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $398 | $20 | Implemented |
UU0057 # 11 Y:2004 | 11 | 2004 | USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL | $25,500 | $192,450 | Not Implemented |
GT0773 # 01 Y:2003 | 01 | 2003 | COMBINE UTILITY METERS | $2,232 | $4,550 | Implemented |
GT0773 # 02 Y:2003 | 02 | 2003 | USE SYNTHETIC LUBRICANT | $2,600 | $0 | Implemented |
GT0773 # 03 Y:2003 | 03 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $460 | $841 | Not Implemented |
GT0773 # 04 Y:2003 | 04 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,023 | $1,650 | Not Implemented |
GT0773 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,860 | $2,500 | Implemented |
GT0773 # 06 Y:2003 | 06 | 2003 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,845 | $6,250 | Implemented |
GT0773 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,743 | $11,070 | Implemented |
GT0773 # 08 Y:2003 | 08 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,410 | $0 | Not Implemented |
GT0773 # 09 Y:2003 | 09 | 2003 | ADJUST VENTS TO MINIMIZE ENERGY USE | $3,600 | $3,200 | Not Implemented |
GT0773 # 10 Y:2003 | 10 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,215 | $33,783 | Not Implemented |
GT0773 # 11 Y:2003 | 11 | 2003 | USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING | $6,590 | $30,000 | Not Implemented |
SF0273 # 01 Y:2003 | 01 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $1,765 | $300 | Implemented |
SF0273 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,656 | $480 | Implemented |
SF0273 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,380 | $8,846 | Not Implemented |
SF0273 # 04 Y:2003 | 04 | 2003 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $106,094 | $76,555 | Not Implemented |
SF0273 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,201 | $7,700 | Not Implemented |
SF0273 # 06 Y:2003 | 06 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $728 | $728 | Implemented |
SF0273 # 07 Y:2003 | 07 | 2003 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $946 | $1,286 | Not Implemented |
SF0273 # 08 Y:2003 | 08 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $36,828 | $60,000 | Not Implemented |
SF0273 # 09 Y:2003 | 09 | 2003 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $5,493 | $15,750 | Not Implemented |