Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
9,722
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0269 # 05 Y:2003 | 05 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,653 | $0 | Implemented |
SF0269 # 06 Y:2003 | 06 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,739 | $3,905 | Not Implemented |
SF0269 # 07 Y:2003 | 07 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $633 | $1,743 | Not Implemented |
SF0268 # 01 Y:2003 | 01 | 2003 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $486 | $0 | Not Implemented |
SF0268 # 02 Y:2003 | 02 | 2003 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $425 | $175 | Not Implemented |
SF0268 # 03 Y:2003 | 03 | 2003 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $19,165 | $10,225 | Not Implemented |
SF0268 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,663 | $1,080 | Not Implemented |
SF0268 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,955 | $2,574 | Not Implemented |
SF0268 # 06 Y:2003 | 06 | 2003 | INSTALL SKYLIGHTS | $2,077 | $1,440 | Not Implemented |
SF0268 # 07 Y:2003 | 07 | 2003 | INSULATE FEEDWATER TANK | $527 | $1,186 | Not Implemented |
SF0268 # 08 Y:2003 | 08 | 2003 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $3,280 | $800 | Not Implemented |
WV0278 # 01 Y:2003 | 01 | 2003 | RECOVER AND REUSE WASTE MATERIAL | $81,748 | $300,000 | Not Implemented |
WV0278 # 02 Y:2003 | 02 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $27,508 | $204 | Implemented |
WV0278 # 03 Y:2003 | 03 | 2003 | REPAIR OR REPLACE STEAM TRAPS | $23,200 | $1,000 | Implemented |
WV0278 # 04 Y:2003 | 04 | 2003 | MINIMIZE WATER USAGE | $21,233 | $3,420 | Not Implemented |
WV0278 # 05 Y:2003 | 05 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $18,480 | $504 | Implemented |
WV0278 # 06 Y:2003 | 06 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,072 | $1,915 | Not Implemented |
WV0278 # 07 Y:2003 | 07 | 2003 | REDUCE EXCESS STEAM BLEEDING | $9,439 | $37,100 | Not Implemented |
WV0278 # 08 Y:2003 | 08 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,418 | $42 | Implemented |
WV0278 # 09 Y:2003 | 09 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,387 | $7,590 | Implemented |
WV0278 # 10 Y:2003 | 10 | 2003 | INSULATE BARE EQUIPMENT | $3,709 | $258 | Implemented |
WV0278 # 11 Y:2003 | 11 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,990 | $0 | Implemented |
WV0278 # 12 Y:2003 | 12 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $674 | $242 | Not Implemented |
WV0278 # 13 Y:2003 | 13 | 2003 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $335 | $1,960 | Not Implemented |
WV0277 # 01 Y:2003 | 01 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $110,201 | $2,195 | Not Implemented |