IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

353

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0168 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN WATER LINES AND VALVES $4,520 $6,800 Not Implemented
DL0168 # 04 Y:2016 04 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $67,220 $62,600 Not Implemented
DL0168 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,120 $1,000 Not Implemented
DL0168 # 09 Y:2016 09 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,900 $190,600 Not Implemented
LE0416 # 02 Y:2016 02 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $22,973 $9,000 Implemented
LE0416 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $43,389 $1,000 Implemented
LE0416 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,060 $4,550 Not Implemented
LE0416 # 04 Y:2016 04 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $18,534 $19,000 Not Implemented
LE0416 # 05 Y:2016 05 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,285 $11,000 Not Implemented
LE0416 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $85,792 $97,000 Implemented
LE0416 # 07 Y:2016 07 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $82,969 $110,000 Not Implemented
LE0416 # 08 Y:2016 08 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,266 $33,000 Not Implemented
LE0416 # 10 Y:2016 10 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,177 $6,325 Not Implemented
LE0416 # 11 Y:2016 11 2016 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $32,117 $87,100 Not Implemented
LE0416 # 12 Y:2016 12 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,521 $4,533 Implemented
LE0416 # 13 Y:2016 13 2016 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $302,516 $1,300,000 Not Implemented
LE0416 # 14 Y:2016 14 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,762 $103,000 Not Implemented
LE0416 # 16 Y:2016 16 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $704 $3,408 Implemented
LE0416 # 15 Y:2016 15 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $19,802 $88,000 Not Implemented
LE0416 # 09 Y:2016 09 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,545 $31,000 Not Implemented
LE0411 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,675 $1,000 Implemented
LE0411 # 01 Y:2016 01 2016 INSTALL TIMERS AND/OR THERMOSTATS $22 $0 Implemented
LE0411 # 02 Y:2016 02 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,142 $25 Implemented
LE0411 # 03 Y:2016 03 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $3,533 $150 Implemented
LE0411 # 04 Y:2016 04 2016 INSTALL TIMERS AND/OR THERMOSTATS $3,292 $625 Implemented