IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,392

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CI0022 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $1,670 $1,125 n/a
CI0017 # 02 Y:2023 02 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $63,711 $90,000 n/a
CI0017 # 03 Y:2023 03 2023 REPLACE BOILER $25,947 $36,000 n/a
CI0017 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,971 $39,000 n/a
CI0017 # 05 Y:2023 05 2023 USE POWER DURING OFF-PEAK PERIODS $12,483 $22,000 n/a
CI0017 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,433 $1,500 n/a
CI0017 # 07 Y:2023 07 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,491 $0 n/a
CI0017 # 08 Y:2023 08 2023 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,591 $5,000 n/a
CI0017 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $271,104 $1,391,144 n/a
SF0606 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $112,666 $923,010 Not Implemented
SF0606 # 06 Y:2023 06 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $7,028 $31,579 Not Implemented
SF0606 # 05 Y:2023 05 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,502 $8,173 Implemented
SF0606 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $5,279 $5,910 Implemented
SF0606 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $1,107 $564 Implemented
SF0606 # 02 Y:2023 02 2023 USE MINIMUM STEAM OPERATING PRESSURE $5,475 $60 Implemented
SF0606 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,495 $1,440 Implemented
SJ0005 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,218 $962 Implemented
SJ0005 # 02 Y:2023 02 2023 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $23,445 $5,613 Not Implemented
SJ0005 # 03 Y:2023 03 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $270 $0 Not Implemented
SJ0005 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,251 $4,556 Not Implemented
SJ0005 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $854 $658 Not Implemented
SJ0005 # 06 Y:2023 06 2023 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $5,992 $2,536 Implemented
SF0601 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $35,057 $0 Implemented
SF0601 # 02 Y:2023 02 2023 USE MINIMUM STEAM OPERATING PRESSURE $1,168 $200 Not Implemented
SF0601 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $402 $80 Not Implemented