IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

352

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0938 # 05 Y:2015 05 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $29,938 $3,000 Not Implemented
UD0938 # 06 Y:2015 06 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,415 $0 Implemented
UD0938 # 07 Y:2015 07 2015 DEVELOP A REPAIR/REPLACE POLICY $152 $530 Implemented
UD0938 # 08 Y:2015 08 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,596 $20,100 Not Implemented
UD0938 # 09 Y:2015 09 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $807 $3,133 Not Implemented
UD0938 # 10 Y:2015 10 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,880 $15,000 Not Implemented
UD0938 # 11 Y:2015 11 2015 MINIMIZE WATER USAGE $27,153 $9,300 Not Implemented
UD0926 # 01 Y:2015 01 2015 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $10,310 $0 Not Implemented
UD0926 # 02 Y:2015 02 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,258 $0 Implemented
UD0926 # 03 Y:2015 03 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $21,384 $1,000 Not Implemented
UD0926 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,287 $0 Implemented
UD0926 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,076 $100 Implemented
UD0926 # 06 Y:2015 06 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,913 $2,050 Not Implemented
UD0926 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,162 $5,000 Not Implemented
UD0926 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $13,106 $31,264 Not Implemented
UD0926 # 09 Y:2015 09 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,575 $2,300 Implemented
UD0926 # 10 Y:2015 10 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,792 $6,100 Not Implemented
UD0926 # 11 Y:2015 11 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $20,362 $80,000 Not Implemented
WV0502 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $321 $854 Implemented
WV0502 # 09 Y:2015 09 2015 INSULATE BARE EQUIPMENT $812 $2,934 Implemented
WV0502 # 08 Y:2015 08 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,826 $500 Implemented
WV0502 # 07 Y:2015 07 2015 DEVELOP A REPAIR/REPLACE POLICY $3,350 $724 Implemented
WV0502 # 06 Y:2015 06 2015 OPTIMIZE PLANT POWER FACTOR $3,830 $16,400 Not Implemented
WV0502 # 05 Y:2015 05 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,333 $2,500 Not Implemented
WV0502 # 01 Y:2015 01 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $13,685 $1,000 Implemented