IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

303

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0975 # 03 Y:2024 03 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,280 $1,334 n/a
GT0975 # 05 Y:2024 05 2024 REPAIR AND ELIMINATE STEAM LEAKS $770 $1,850 n/a
GT0975 # 07 Y:2024 07 2024 MINIMIZE WATER USAGE $64,161 $237,800 n/a
GT0975 # 04 Y:2024 04 2024 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $39,992 $87,500 n/a
GT0975 # 06 Y:2024 06 2024 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $4,603 $11,665 n/a
GT0975 # 02 Y:2024 02 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $3,668 $2,732 n/a
GT0975 # 01 Y:2024 01 2024 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $442 $197 n/a
KS2324 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $32,201 $0 n/a
KS2324 # 04 Y:2023 04 2023 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $12,787 $8,320 n/a
KS2324 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,738 $5,480 n/a
KS2324 # 07 Y:2023 07 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $57,559 $312,824 n/a
KS2324 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $2,028 $4,064 n/a
KS2324 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,344 $22,467 n/a
KS2324 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $63,860 $598,739 n/a
GT0965 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,014 $1,850 Implemented
GT0965 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,164 $800 Implemented
GT0965 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $281 $927 Implemented
GT0965 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $23,363 $800 Not Implemented
GT0965 # 05 Y:2023 05 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $103,640 $350,000 Not Implemented
GT0964 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $78,169 $1,850 Implemented
GT0964 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,849 $36,015 Not Implemented
GT0964 # 02 Y:2023 02 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $142,026 $175,000 Not Implemented
GT0964 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $1,788 $8,500 Not Implemented
GT0964 # 04 Y:2023 04 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,786 $50,570 Implemented
GT0960 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,666 $8,719 Implemented