IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

181

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0064 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $204 $130 Implemented
NL0064 # 01 Y:2022 01 2022 USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS $79,442 $292,000 Implemented
NL0064 # 04 Y:2022 04 2022 USE HIGH PRESSURE WASH SYSTEMS $768 $240 Implemented
NL0064 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,248 $2,875 Implemented
NL0064 # 05 Y:2022 05 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $331 $90 Implemented
NL0064 # 02 Y:2022 02 2022 INSULATE BARE EQUIPMENT $1,251 $1,729 Implemented
MZ0277 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,416 $4,211 Implemented
MZ0277 # 09 Y:2019 09 2019 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $409 $1,200 Implemented
MZ0277 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,816 $3,021 Implemented
MZ0277 # 07 Y:2019 07 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $70,665 $233,814 Implemented
MZ0277 # 06 Y:2019 06 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $55,889 $160 Implemented
MZ0277 # 05 Y:2019 05 2019 INSTALL SPECTRAL REFLECTORS / DELAMP $8,418 $1,920 Not Implemented
MZ0277 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $1,650 $2,700 Implemented
MZ0277 # 01 Y:2019 01 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,394 $440 Not Implemented
MZ0277 # 02 Y:2019 02 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $28,719 $50,000 Not Implemented
IA0562 # 06 Y:2016 06 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $1,171 $2,324 Not Implemented
IA0562 # 04 Y:2016 04 2016 DIRECT WARMEST AIR TO COMBUSTION INTAKE $4,205 $2,457 Implemented
IA0562 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $721 $1,740 Implemented
IA0562 # 02 Y:2016 02 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,222 $7,477 Implemented
IA0562 # 05 Y:2016 05 2016 DISCONNECT BALLASTS $2,687 $980 Not Implemented
IA0562 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,873 $750 Implemented
IA0562 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,778 $52,400 Implemented
IA0549 # 01 Y:2016 01 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,365 $16,877 Implemented
IA0549 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,832 $20,111 Implemented
IA0549 # 03 Y:2016 03 2016 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,200 $700 Not Implemented