IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

98

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0081 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,098 $23,216 Not Implemented
IC0081 # 01 Y:2004 01 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $599 $0 Implemented
IC0081 # 02 Y:2004 02 2004 INSTALL SET-BACK TIMERS $2,895 $159 Implemented
IC0081 # 09 Y:2004 09 2004 USE PHOTOCELL CONTROLS $539 $199 Not Implemented
IC0081 # 08 Y:2004 08 2004 USE PHOTOCELL CONTROLS $6,675 $6,231 Not Implemented
IC0081 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,022 $22,332 Not Implemented
IC0081 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,195 $600 Implemented
IC0081 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $347 $0 Implemented
IC0081 # 05 Y:2004 05 2004 UPGRADE OBSOLETE EQUIPMENT $411 $2,300 Not Implemented
IC0079 # 09 Y:2004 09 2004 $1,159,243 $6,681,290 Implemented
IC0079 # 08 Y:2004 08 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,734 $0 Implemented
IC0079 # 07 Y:2004 07 2004 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $1,706 $0 Not Implemented
IC0079 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $522 $400 Implemented
IC0079 # 02 Y:2004 02 2004 USE OPTIMUM TEMPERATURE $4,226 $0 Not Implemented
IC0079 # 03 Y:2004 03 2004 INSTALL AUTOMATIC STACK DAMPER $943 $375 Not Implemented
IC0079 # 04 Y:2004 04 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $311 $224 Implemented
IC0079 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,244 $18,858 Implemented
IC0079 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $2,248 $9,540 Implemented
BD0262 # 01 Y:2004 01 2004 INSTALL TURBULATORS $40,923 $2,400 Implemented
BD0262 # 14 Y:2004 14 2004 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,289 $5,500 Implemented
BD0262 # 11 Y:2004 11 2004 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $32,008 $100 Not Implemented
BD0262 # 03 Y:2004 03 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $8,498 $4,000 Not Implemented
BD0262 # 12 Y:2004 12 2004 $436,800 $99,000 Not Implemented
BD0262 # 02 Y:2004 02 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $12,994 $3,000 Implemented
BD0262 # 13 Y:2004 13 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $13,000 $300 Implemented