IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

83

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0610 # 12 Y:2021 12 2021 INSULATE BARE EQUIPMENT $409 $488 Implemented
WV0610 # 07 Y:2021 07 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,772 $4,186 Not Implemented
WV0610 # 11 Y:2021 11 2021 DEVELOP A REPAIR/REPLACE POLICY $2,566 $733 Implemented
WV0610 # 03 Y:2021 03 2021 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $12,856 $33,120 Not Implemented
WV0610 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,437 $2,340 Implemented
WV0610 # 06 Y:2021 06 2021 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,869 $3,900 Implemented
WV0610 # 04 Y:2021 04 2021 CHECK FOR ACCURACY OF UTILITY / POWER METERS $5,861 $600 Implemented
WV0610 # 10 Y:2021 10 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,654 $100 Implemented
WV0610 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,994 $14,525 Implemented
WV0610 # 09 Y:2021 09 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,674 $1,700 Implemented
WV0610 # 08 Y:2021 08 2021 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $4,217 $19,800 Not Implemented
WV0610 # 02 Y:2021 02 2021 UPGRADE CONTROLS ON COMPRESSORS $23,895 $37,803 Not Implemented
DL0151 # 01 Y:2015 01 2015 USE CORRECT SIZE STEAM TRAPS $12,870 $2,380 Not Implemented
DL0151 # 04 Y:2015 04 2015 OPERATE BOILERS ON HIGH FIRE SETTING $10,860 $4,610 Not Implemented
DL0151 # 02 Y:2015 02 2015 MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS $37,680 $12,400 Not Implemented
DL0151 # 03 Y:2015 03 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $60,250 $20,000 Not Implemented
DL0151 # 08 Y:2015 08 2015 MINIMIZE WATER USAGE $80,640 $200,250 Not Implemented
DL0151 # 05 Y:2015 05 2015 UPGRADE CONTROLS ON COMPRESSORS $7,730 $11,520 Not Implemented
DL0151 # 06 Y:2015 06 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,550 $14,400 Not Implemented
DL0151 # 07 Y:2015 07 2015 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $1,970 $4,480 Not Implemented
WV0462 # 12 Y:2013 12 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $476 $604 Not Implemented
WV0462 # 11 Y:2013 11 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,390 $7,119 Implemented
WV0462 # 06 Y:2013 06 2013 REPAIR OR REPLACE STEAM TRAPS $42,971 $6,850 Implemented
WV0462 # 05 Y:2013 05 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $57,184 $0 Implemented
WV0462 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $167,190 $95,000 Not Implemented