IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0598 # 02 Y:2020 02 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $28,134 $48,344 Not Implemented
WV0598 # 01 Y:2020 01 2020 INSTALL SENSORS TO DETECT DEFECTS $30,600 $10,470 Not Implemented
WV0598 # 05 Y:2020 05 2020 RECYCLE WHITE WATER $1,467 $3,170 Implemented
WV0598 # 03 Y:2020 03 2020 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE $8,920 $11,220 Not Implemented
WV0598 # 07 Y:2020 07 2020 DEVELOP A REPAIR/REPLACE POLICY $564 $613 Implemented
WV0598 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $7,292 $6,768 Implemented
WV0598 # 06 Y:2020 06 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $916 $1,021 Implemented
WV0508 # 11 Y:2015 11 2015 INSULATE BARE EQUIPMENT $733 $1,287 Implemented
WV0508 # 10 Y:2015 10 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,083 $29 Implemented
WV0508 # 09 Y:2015 09 2015 ISOLATE HOT OR COLD EQUIPMENT $3,639 $5,172 Not Implemented
WV0508 # 08 Y:2015 08 2015 DEVELOP A REPAIR/REPLACE POLICY $3,800 $545 Implemented
WV0508 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,521 $194 Implemented
WV0508 # 01 Y:2015 01 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $25,372 $17,412 Not Implemented
WV0508 # 02 Y:2015 02 2015 UPGRADE CONTROLS ON COMPRESSORS $24,572 $25,343 Not Implemented
WV0508 # 03 Y:2015 03 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,607 $81,480 Not Implemented
WV0508 # 04 Y:2015 04 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $14,278 $1,000 Implemented
WV0508 # 05 Y:2015 05 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,854 $1,700 Implemented
WV0508 # 06 Y:2015 06 2015 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $10,108 $7,873 Not Implemented
WV0260 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,475 $198 Not Implemented
WV0260 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $534 $0 Implemented
WV0260 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $456 $250 Not Implemented
WV0260 # 13 Y:2003 13 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $298 $40 Implemented
WV0260 # 12 Y:2003 12 2003 REPAIR AND ELIMINATE STEAM LEAKS $411 $1,000 Implemented
WV0260 # 11 Y:2003 11 2003 MINIMIZE WATER USAGE $26,493 $6,000 Not Implemented
WV0260 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,293 $4,594 Implemented