IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

305

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0609 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,170 $300 Implemented
CO0609 # 04 Y:2007 04 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $580 $4,570 Not Implemented
CO0609 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,370 $60 Not Implemented
CO0609 # 06 Y:2007 06 2007 INSTALL OCCUPANCY SENSORS $1,260 $2,160 Not Implemented
CO0609 # 05 Y:2007 05 2007 USE SOLAR HEAT TO MAKE ELECTRICTY $1,530 $11,000 Not Implemented
CO0609 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $161 $846 Implemented
IA0415 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,060 $500 Implemented
IA0415 # 10 Y:2007 10 2007 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $2,038 $2,236 Implemented
IA0415 # 07 Y:2007 07 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $84,655 $36,000 Not Implemented
IA0415 # 08 Y:2007 08 2007 INSULATE BARE EQUIPMENT $525 $635 Implemented
IA0415 # 01 Y:2007 01 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,297 $1,586 Implemented
IA0415 # 11 Y:2007 11 2007 INSULATE BARE EQUIPMENT $2,180 $1,563 Not Implemented
IA0415 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,670 $3,539 Implemented
IA0415 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,722 $6,274 Implemented
IA0415 # 05 Y:2007 05 2007 DIRECT WARMEST AIR TO COMBUSTION INTAKE $4,262 $1,500 Implemented
IA0415 # 06 Y:2007 06 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,867 $3,329 Implemented
IA0415 # 09 Y:2007 09 2007 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,560 $740 Implemented
CO0608 # 01 Y:2007 01 2007 UPGRADE CONTROLS ON COMPRESSORS $11,650 $56,600 Implemented
CO0608 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,530 $1,500 Implemented
TT0013 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,410 $10,550 Not Implemented
TT0013 # 01 Y:2007 01 2007 OPTIMIZE PLANT POWER FACTOR $60,000 $180,000 Not Implemented
CO0608 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,470 $60 Implemented
CO0608 # 04 Y:2007 04 2007 REPLACE BOILER $23,660 $20,000 Implemented
CO0608 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $340 $1,370 Implemented
TT0013 # 03 Y:2007 03 2007 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $235,000 $425,000 Not Implemented