IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

372

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0061 # 01 Y:2010 01 2010 USE OPTIMUM THICKNESS INSULATION $145 $300 Implemented
MZ0061 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $607 $150 Not Implemented
MZ0061 # 08 Y:2010 08 2010 REDUCE SCRAP PRODUCTION $92,766 $100,000 Implemented
MZ0061 # 10 Y:2010 10 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $250,000 $1,500,000 Not Implemented
MZ0061 # 11 Y:2010 11 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,994 $5,000 Implemented
MZ0061 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,019 $0 Implemented
MZ0061 # 02 Y:2010 02 2010 USE OPTIMUM THICKNESS INSULATION $79 $1,200 Implemented
MZ0061 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,184 $0 Implemented
MZ0061 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $36,947 $2,160 Implemented
MZ0061 # 09 Y:2010 09 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,880 $0 Not Implemented
MZ0061 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $62,160 $3,680 Implemented
MZ0060 # 06 Y:2010 06 2010 DEVELOP A REPAIR/REPLACE POLICY $6,343 $12,500 Not Implemented
MZ0060 # 05 Y:2010 05 2010 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $103,362 $10,000 Not Implemented
MZ0060 # 04 Y:2010 04 2010 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $699 $8,922 Not Implemented
MZ0060 # 02 Y:2010 02 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,269 $18,857 Not Implemented
MZ0060 # 03 Y:2010 03 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $329 $0 Not Implemented
MZ0060 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $32,699 $5,400 Implemented
DL0063 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,400 $57,000 Not Implemented
LE0309 # 06 Y:2010 06 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,925 $0 Implemented
DL0063 # 02 Y:2010 02 2010 REDUCE VENTILATION AIR $34,080 $500 Implemented
DL0063 # 03 Y:2010 03 2010 INCREASE AMOUNT OF CONDENSATE RETURNED $31,600 $1,610 Implemented
LE0309 # 05 Y:2010 05 2010 PREHEAT COMBUSTION AIR WITH WASTE HEAT $11,117 $30,000 Not Implemented
DL0063 # 13 Y:2010 13 2010 RECOVER WASTE HEAT FROM EQUIPMENT $10,700 $3,900 Not Implemented
DL0063 # 11 Y:2010 11 2010 INSTALL OCCUPANCY SENSORS $12,978 $1,012 Implemented
DL0063 # 12 Y:2010 12 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $11,600 $1,585 Implemented