Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
396
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0035 # 03 Y:2013 | 03 | 2013 | REPAIR OR REPLACE STEAM TRAPS | $7,478 | $1,500 | Implemented |
WM0035 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,932 | $1,000 | Implemented |
WM0035 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $771 | $0 | Not Implemented |
WM0035 # 06 Y:2013 | 06 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,953 | $0 | Implemented |
WM0035 # 05 Y:2013 | 05 | 2013 | INSULATE BARE EQUIPMENT | $1,145 | $200 | Not Implemented |
WM0035 # 07 Y:2013 | 07 | 2013 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $594 | $0 | Implemented |
WM0035 # 04 Y:2013 | 04 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,425 | $2,270 | Implemented |
OK0870 # 04 Y:2013 | 04 | 2013 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $20,022 | $105,120 | Not Implemented |
OK0870 # 03 Y:2013 | 03 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $1,212 | $2,500 | Not Implemented |
OK0870 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,957 | $0 | Implemented |
OK0870 # 01 Y:2013 | 01 | 2013 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $8,384 | $0 | Implemented |
MZ0132 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,108 | $1,630 | Implemented |
MZ0132 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,152 | $12,430 | Implemented |
MZ0132 # 06 Y:2013 | 06 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,895 | $2,000 | Not Implemented |
MZ0132 # 10 Y:2013 | 10 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,050 | $925 | Not Implemented |
MZ0132 # 12 Y:2013 | 12 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,198 | $0 | Not Implemented |
MZ0132 # 02 Y:2013 | 02 | 2013 | INCREASE AMOUNT OF CONDENSATE RETURNED | $28,581 | $40,000 | Implemented |
MZ0132 # 03 Y:2013 | 03 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $28,256 | $4,000 | Not Implemented |
MZ0132 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,620 | $3,100 | Not Implemented |
MZ0132 # 01 Y:2013 | 01 | 2013 | OPERATE BOILERS ON HIGH FIRE SETTING | $67,232 | $111,000 | Not Implemented |
MZ0132 # 14 Y:2013 | 14 | 2013 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $865 | $635 | Implemented |
MZ0132 # 11 Y:2013 | 11 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,911 | $1,030 | Not Implemented |
MZ0132 # 08 Y:2013 | 08 | 2013 | REDUCE EXCESSIVE BOILER BLOWDOWN | $4,877 | $2,600 | Implemented |
MZ0132 # 09 Y:2013 | 09 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,603 | $3,100 | Implemented |
MZ0132 # 13 Y:2013 | 13 | 2013 | INSTALL OCCUPANCY SENSORS | $1,565 | $640 | Implemented |