matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0035 # 06 Y:2013 | 06 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,953 | $0 | Implemented |
WM0035 # 04 Y:2013 | 04 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,425 | $2,270 | Implemented |
WM0035 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,932 | $1,000 | Implemented |
WM0035 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $771 | $0 | Not Implemented |
WM0035 # 05 Y:2013 | 05 | 2013 | INSULATE BARE EQUIPMENT | $1,145 | $200 | Not Implemented |
WM0035 # 03 Y:2013 | 03 | 2013 | REPAIR OR REPLACE STEAM TRAPS | $7,478 | $1,500 | Implemented |
WM0035 # 07 Y:2013 | 07 | 2013 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $594 | $0 | Implemented |
OK0870 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,957 | $0 | Implemented |
OK0870 # 01 Y:2013 | 01 | 2013 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $8,384 | $0 | Implemented |
OK0870 # 03 Y:2013 | 03 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $1,212 | $2,500 | Not Implemented |
OK0870 # 04 Y:2013 | 04 | 2013 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $20,022 | $105,120 | Not Implemented |
MZ0132 # 12 Y:2013 | 12 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,198 | $0 | Not Implemented |
MZ0132 # 09 Y:2013 | 09 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,603 | $3,100 | Implemented |
MZ0132 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,108 | $1,630 | Implemented |
MZ0132 # 10 Y:2013 | 10 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,050 | $925 | Not Implemented |
MZ0132 # 08 Y:2013 | 08 | 2013 | REDUCE EXCESSIVE BOILER BLOWDOWN | $4,877 | $2,600 | Implemented |
MZ0132 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,620 | $3,100 | Not Implemented |
MZ0132 # 03 Y:2013 | 03 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $28,256 | $4,000 | Not Implemented |
MZ0132 # 02 Y:2013 | 02 | 2013 | INCREASE AMOUNT OF CONDENSATE RETURNED | $28,581 | $40,000 | Implemented |
MZ0132 # 01 Y:2013 | 01 | 2013 | OPERATE BOILERS ON HIGH FIRE SETTING | $67,232 | $111,000 | Not Implemented |
MZ0132 # 06 Y:2013 | 06 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,895 | $2,000 | Not Implemented |
MZ0132 # 14 Y:2013 | 14 | 2013 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $865 | $635 | Implemented |
MZ0132 # 11 Y:2013 | 11 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,911 | $1,030 | Not Implemented |
MZ0132 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,152 | $12,430 | Implemented |
MZ0132 # 15 Y:2013 | 15 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $791 | $1,000 | Implemented |