Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,715
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2501 # 02 Y:2025 | 02 | 2025 | REPAIR OR REPLACE STEAM TRAPS | $83,082 | $9,800 | n/a |
UW2501 # 05 Y:2025 | 05 | 2025 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $6,682 | $32,756 | n/a |
UW2501 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,175 | $10,269 | n/a |
UW2501 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $8,699 | $6,545 | n/a |
UW2501 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $41,957 | $25,000 | n/a |
IP0207 # 01 Y:2025 | 01 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,560 | $0 | n/a |
IP0207 # 02 Y:2025 | 02 | 2025 | OPTIMIZE PLANT POWER FACTOR | $7,162 | $5,708 | n/a |
IP0207 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,969 | $3,653 | n/a |
IP0207 # 03 Y:2025 | 03 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $184 | $227 | n/a |
IP0207 # 04 Y:2025 | 04 | 2025 | INSTALL OCCUPANCY SENSORS | $970 | $1,387 | n/a |
NL0109 # 04 Y:2025 | 04 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,783 | $2,080 | n/a |
NL0109 # 03 Y:2025 | 03 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,510 | $2,000 | n/a |
NL0109 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $400 | $1,000 | n/a |
NL0109 # 01 Y:2025 | 01 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $45,070 | $240,000 | n/a |
NL0109 # 02 Y:2025 | 02 | 2025 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $12,694 | $500 | n/a |
DL0252 # 01 Y:2025 | 01 | 2025 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $2,602 | $0 | n/a |
DL0252 # 03 Y:2025 | 03 | 2025 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $28,847 | $27,000 | n/a |
DL0252 # 04 Y:2025 | 04 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $8,172 | $9,000 | n/a |
DL0252 # 02 Y:2025 | 02 | 2025 | REDUCE VENTILATION AIR | $4,684 | $1,500 | n/a |
DL0252 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,540 | $1,500 | n/a |
DL0252 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $657 | $1,000 | n/a |
DL0252 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,945 | $9,000 | n/a |
LE0592 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $40,366 | $3,000 | n/a |
LE0592 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $2,361 | $3,915 | n/a |
LE0592 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,485 | $7,000 | n/a |