IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
NAICS 3111 Animal Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1047 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $876 $500 Implemented
OK1047 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,212 $1,242 Implemented
OK1047 # 01 Y:2021 01 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,181 $17,737 Implemented
OK1047 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,774 $6,045 Implemented
OK1021 # 04 Y:2019 04 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $6,865 $426 Implemented
OK1021 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,570 $850 Implemented
OK1021 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,490 $4,312 Implemented
OK1021 # 01 Y:2019 01 2019 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $957 $524 Implemented
OK1021 # 05 Y:2019 05 2019 INSTALL SUB-METERING EQUIPMENT $5,665 $887 Not Implemented
OK0937 # 05 Y:2016 05 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,445 $12,000 Implemented
OK0937 # 09 Y:2016 09 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,032 $132,000 Not Implemented
OK0937 # 08 Y:2016 08 2016 OPTIMIZE PLANT POWER FACTOR $9,089 $6,160 Not Implemented
OK0937 # 07 Y:2016 07 2016 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $74,720 $594,190 Not Implemented
OK0937 # 06 Y:2016 06 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,197 $2,060 Not Implemented
OK0937 # 04 Y:2016 04 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,363 $15,376 Not Implemented
OK0937 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,346 $88,560 Implemented
OK0937 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,667 $5,324 Implemented
OK0937 # 01 Y:2016 01 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,095 $1,646 Not Implemented
OK0857 # 01 Y:2013 01 2013 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $46,232 $492,750 Not Implemented
OK0803 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,212 $2,024 Not Implemented
OK0803 # 07 Y:2011 07 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,821 $18,906 Implemented
OK0803 # 06 Y:2011 06 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $2,896 $1,465 Implemented
OK0803 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $74 $524 Not Implemented
OK0803 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,156 $13,723 Not Implemented
OK0803 # 01 Y:2011 01 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $17,686 $22,080 Implemented