IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

537

matching recommendations
Reset
NAICS 31111 Animal Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0339 # 04 Y:2008 04 2008 USE SYNTHETIC LUBRICANT $116 $76 Implemented
BD0339 # 05 Y:2008 05 2008 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $10,344 $2,501 Not Implemented
BD0339 # 06 Y:2008 06 2008 INSTALL TURBULATORS $755 $781 Not Implemented
BD0339 # 07 Y:2008 07 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,766 $9,021 Implemented
BD0336 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $106 $151 Not Implemented
BD0336 # 02 Y:2008 02 2008 UPGRADE OBSOLETE EQUIPMENT $226 $2 Not Implemented
BD0336 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $95 $151 Not Implemented
BD0336 # 04 Y:2008 04 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $948 $1,001 Not Implemented
BD0336 # 05 Y:2008 05 2008 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,096 $2,501 Not Implemented
BD0336 # 06 Y:2008 06 2008 INSTALL TURBULATORS $2,117 $2,501 Not Implemented
BD0336 # 07 Y:2008 07 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $558 $151 Implemented
BD0336 # 08 Y:2008 08 2008 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,960 $2 Not Implemented
LE0253 # 01 Y:2007 01 2007 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $41,910 $32,000 Implemented
LE0253 # 02 Y:2007 02 2007 ELIMINATE/REDUCE AN OPERATION $40,620 $4,000 Not Implemented
LE0253 # 03 Y:2007 03 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $22,542 $300 Implemented
LE0253 # 04 Y:2007 04 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $20,904 $300 Implemented
LE0253 # 05 Y:2007 05 2007 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $20,819 $37,000 Implemented
LE0253 # 06 Y:2007 06 2007 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $12,436 $15,000 Not Implemented
LE0253 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,186 $1,000 Implemented
LE0253 # 08 Y:2007 08 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,349 $6,200 Implemented
LE0253 # 09 Y:2007 09 2007 INSTALL TIMERS AND/OR THERMOSTATS $8,342 $480 Not Implemented
LE0253 # 10 Y:2007 10 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,672 $2,500 Not Implemented
LE0253 # 11 Y:2007 11 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $1,980 $510 Not Implemented
LE0253 # 12 Y:2007 12 2007 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $60,000 $100,000 Not Implemented
LM0120 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,819 $0 Implemented